Electrical Substation Sample Clauses

Electrical Substation. The Landlord shall design and provide at no cost to the Tenant an area on site sufficient to house an electrical substation which will be constructed by Tenant. In the event that in the future the Landlord requires additional electrical service from the substation, provided that Landlord’s use does not interfere with Tenant’s use of the substation, including but not limited to degradation of electrical power, it shall have the right to add to the substation for such additional electrical use, upon at least thirty (30) days prior written notice. In such event upon the completion of such addition, Landlord shall share proportionately in the cost of maintenance of such substation and shall be billed for such use at the same cost incurred by Tenant from the electric supplier. In the event that the area provided by the Landlord for such substation is insufficient for the Tenant’s purposes, Landlord will provide the additional space required for such addition and replace it at no cost to the Tenant. Any parking spaces lost by virtue of such increase shall be replaced by the Landlord on the south side of the building at no cost to the Tenant so that the Tenant will always have a minimum of 378 parking spaces on site.
AutoNDA by SimpleDocs
Electrical Substation. TENANT, at its own cost and expense and without any right to reimbursement from LANDLORD, may build, install and maintain in coordination with LANDLORD an electrical substation on the Leased Premises and connect it to Landlord’s distribution lines, subject to compliance with PREPA’s requirements. Under no circumstances shall TENANT install an electrical substation without LANDLORD’s prior approval as to the capacity and power of said substation, its location within the Leased Premises, and the routing path of the power lines.
Electrical Substation. Tenant, at its own cost and expense and without any right to reimbursement from Landlord, may build or install in coordination with Landlord an electric energy Substation on the Leased Premises and connect it to PREPA's distribution lines, subject to compliance with PREPA's requirements. Under no circumstances shall Tenant install an electrical substation without Landlord's prior approval as to the capacity and power of said substation, its location within the Leased Premises, and the routing path of the power lines.
Electrical Substation 

Related to Electrical Substation

  • Electrical Provide drawings for the following systems:

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

Time is Money Join Law Insider Premium to draft better contracts faster.