Design & Construction Standards and Certification Sample Clauses

Design & Construction Standards and Certification. ‌ The rig DD-8 Rig is classified by ABS as A1 Self Elevating Mobile Offshore Drilling Unit –CDS (Certified Drilling System)Certified (MODU) and constructed in accordance with the standards described in the 1973 ABS Rules for Building and Classing Mobile Offshore Drilling Units. • The manufacturer/ his representative certifies the mast and superstructure. • All over head string components are inspected as per API - RP8B. • All cranes are inspected as per ABS. • All well control equipment including BOP will be tested with water, prior to spud, to its rated test pressure. • Drill string components will be inspected as per API – RP7G and DS-1 Category 4. Only certified well services equipment will be used. Appropriate certifying documentation must be provided to enable this to be verified. If the documentation does not arrive with the equipment, the equipment will not be put in to service until such time as verification can be made, unless approved in writing by the HOEC Drilling Supervisor and the DD-8 Rig OIM. In addition, approvals must be obtained from the HOEC Drilling Tech. Manager / Drilling Supdt. and DD-8 Rig Manager. Any additional HSE – critical equipment manufactured in India or on the rig will require appropriate certification prior to use, e.g. pressure vessels and lifting equipment. It is the responsibility of the HOEC Drilling Supervisor to ensure that any such additional equipment is fit- for-purpose and safe to use prior to entering service. All lifting equipment (i.e. slings, harness, padeyes etc) shall be inspected and certified prior to use by DD-8 team as per DD-8 Rig Procedure and each of the service company policies. At any time, if XXXX finds that the policies are not followed or they are inadequate, then HOEC will have the right to implement HOEC lifting equipment policy.
AutoNDA by SimpleDocs

Related to Design & Construction Standards and Certification

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Construction Standards The Subrecipient and Developer shall ensure that all Approved Projects comply with the following requirements:

  • Construction Safety Prior to contract award, the successful bidder must provide a Certificate of Recognition or Letter of Good Standing issued by an occupational health and safety organization approved by the Workers’ Compensation Board of Nova Scotia.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction of Public Improvements a. Upon satisfaction of the conditions set forth in Paragraph 2.1 and the notice requirement set forth below, Developer shall construct the Public Improvements at its own expense in accordance with this Agreement, the Final Plat, the Resolution, the Civil Engineering Construction Plans, the Town’s ordinances, resolutions and regulations and all other applicable laws and regulations. All Public Improvements shall be installed and constructed within the rights- of-way or easements dedicated to the Town. Unless otherwise approved by the Town in writing, all materials used for constructing the Public Improvements shall be materials set forth on the Town’s approved material list. Workmanship and materials shall be of good quality.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • Design Standards Most recent edition of the “Owner’s Design Standards,” including any partial updates as may be directed by the Owner.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Design Criteria and Standards All PROJECTS/SERVICES shall be performed in accordance with instructions, criteria and standards set forth by the DIRECTOR.