Design and Bid Sample Clauses

Design and Bid. Upon receipt of the Escrow in the amount of 110% of the City’s estimated cost, the City shall design, or cause to be designed, and bid construction of the applicable water main(s) as soon as reasonably possible. The City shall notify Sundance upon receipt of the actual bids, and the amount of the Escrow shall be either increased or decreased to match 100% of the actual lowest responsible bid.
AutoNDA by SimpleDocs
Design and Bid. Upon receipt of the Escrow in the amount of 100% of the City’s accepted bid cost, the City shall design, or cause to be designed, construct the Xxx Xxxx Street Water Main, East of 98th Street, as soon as reasonably possible.

Related to Design and Bid

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Design Review Consumer shall provide Holy Cross an electrical one-line diagram and a relaying and metering one-line diagram prior to completion of detailed designs, unless the Consumer is installing a packaged system that is pre-certified to IEEE 1547.1 and UL 1741 standards. Packaged systems pre-certified under IEEE Standard 1547.1 and UL Standard 1741 will not require a relaying and metering one-line diagram. The submitted application and diagrams will be processed, reviewed, and acted upon in accordance with the Holy Cross Interconnection Policy.

  • Approval and Completion If any dispute regarding the design of the Tenant Improvements is not settled within 10 business days after notice of such dispute is delivered by one party to the other, Tenant may make the final decision regarding the design of the Tenant Improvements, provided (i) Tenant acts reasonably and such final decision is either consistent with or a compromise between Landlord’s and Tenant’s positions with respect to such dispute, (ii) that all costs and expenses resulting from any such decision by Tenant shall be payable out of the TI Fund (as defined in Section 5(d) below), and (iii) Tenant’s decision will not affect the base Building, structural components of the Building or any Building systems (in which case Landlord shall make the final decision). Any changes to the TI Construction Drawings following Landlord’s and Tenant’s approval of same requested by Tenant shall be processed as provided in Section 4 hereof.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Project Management Project Management Institute (PMI) certified project manager executing any or all of the following: • Development of Project Charter • Development of project plan and schedule • Coordination and scheduling of project activities across customer and functional areas • Consultation on operational and infrastructure requirements, standards and configurations • Facilitate project status meetings • Timely project status reporting • Address project issues with functional areas and management • Escalation of significant issues to customers and executive management • Manage project scope and deliverable requirements • Document changes to project scope and schedule • Facilitate and document project closeout

  • Uncovering and Correction of Work 12 Uncovering of Work 12.1 Unforeseen Conditions, Concealed or Unknown 3.7.4, 8.3.1, 10.3 Unit Prices 7.3.3.2, 9.1.2

  • Validation ‌ Within one (1) year after the effective date of this contract, the Agency shall submit this contract to a court of competent jurisdiction for determination of its validity by a proceeding in mandamus or other appropriate proceeding or action, which proceeding or action shall be diligently prosecuted to final decree or judgment. In the event that this contract is determined to be invalid by such final decree or judgment, the State shall make all reasonable efforts to obtain validating legislation at the next session of the Legislature empowered to consider such legislation, and within six (6) months after the close of such session, if such legislation shall have been enacted, the Agency shall submit this contract to a court of competent jurisdiction for redetermination of its validity by appropriate proceeding or action, which proceeding or action shall be diligently prosecuted to final decree or judgment.