Description of the Proposed KAC Project Study Area Sample Clauses

Description of the Proposed KAC Project Study Area. The Study Area for the proposed KAC project is located within the boundaries of Anchorage and the Mat-Su in the Upper Cook Inlet region of Southcentral Alaska (Figure 1.2). This area has a combined population of nearly 350,000, which represents over 50 percent of Alaska’s total population. Separating the Anchorage and Mat-Su portions of the Study Area is a 30-mile-long waterway, Knik Arm, which varies in width from 2 to 6 miles. Anchorage is just 2 to 3 miles from Port MacKenzie and its adjacent industrial district in the Mat-Su. Knik Arm Crossing Traffic Noise Technical Report
AutoNDA by SimpleDocs

Related to Description of the Proposed KAC Project Study Area

  • Scope of the Project Under this Agreement, the scope of the Project (the “Scope of the Project”) shall mean and include:

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Development of the Project 4.1 TSP's obligations in development of the Project: Subject to the terms and conditions of this Agreement, the TSP at its own cost and expense shall observe, comply with, perform, undertake and be responsible:

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • SCOPE OF THE WORK The Contractor shall furnish all the materials, perform all of the Work, and do all things required by the Contract Documents.

  • Feasibility Study 4.3.1 The Feasibility Study shall identify any potential adverse system impacts that would result from the interconnection of the Generating Facility.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)

  • Project Site The “Project Site” is the place where the Work is being carried on.

Time is Money Join Law Insider Premium to draft better contracts faster.