Common use of Cost of the Work Clause in Contracts

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 40 contracts

Samples: Electronic Data Transfer Agreement, Agreement, Agreement

AutoNDA by SimpleDocs

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 10 contracts

Samples: Form of Agreement (Nu Skin Enterprises Inc), Professional Practice 544, Professional Practice 544

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ the Construction Manager’s general conditions costs, overhead overhead, and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the compensation of the Construction Manager for Preconstruction Phase services; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 7 contracts

Samples: Owner Architect Agreement, Owner Architect Agreement, Owner Architect Agreement

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 3 contracts

Samples: legistarweb-production.s3.amazonaws.com, www.hammond.org, www.hammond.org

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Ownercosts.

Appears in 3 contracts

Samples: Agreement, Agreement, www.durhamnc.gov

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include the contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value compensation of laborthe Construction Manager and Construction Manager’s consultants during the Construction Phase only, materialsincluding compensation for reimbursable expenses at the job site, and equipment, donated to, or otherwise furnished by, the Ownerif any. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 3 contracts

Samples: www.southernplainsedcoop.org, www.westada.org, static1.squarespace.com

Cost of the Work. § 6.1 5.1 For purposes of this the Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 2 contracts

Samples: www.maine.edu, www.sedgwickcounty.org

Cost of the Work. § 6.1 For purposes of this the Agreement, the Cost of the Work shall be the total cost to the Owner to construct construct, purchase and install all elements of the Project designed or specified by the Architect and shall include contractors’ and vendors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 2 contracts

Samples: content.aia.org, www.gov.bm

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or and contingencies for changes in the Work; Work or other costs that are the responsibility of the Ownercosts.

Appears in 2 contracts

Samples: www.durhamnc.gov, www.durhamnc.gov

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all Ow elements of the Project designed or specified by the Architect and shall include contractors’ general to construct all eral conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 2 contracts

Samples: timnath.org, timnath.org

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to paid by the Owner to construct all elements of the Project designed or specified by the Architect and approved by Owner, and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the ArchitectArchitect or the Owner’s other consultants; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 2 contracts

Samples: www.vanderbilt.edu, cdn.vanderbilt.edu

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to paid by the Owner to construct all elements of the Project designed or specified by the Architect Engineer and approved by Owner, and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the ArchitectEngineer or the Owner’s other consultants; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 2 contracts

Samples: www.vanderbilt.edu, cdn.vanderbilt.edu

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractorsthe Construction Managers’ general conditions costs, overhead overhead, and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the compensation of the Construction Manager for Preconstruction Phase services, the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 2 contracts

Samples: West Lafayette Rec Center, Agreement

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include the contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value compensation of laborthe Construction Manager and Construction Manager’s Consultants during the Construction Phase only, materialsincluding compensation for reimbursable expenses at the job site, and equipment, donated to, or otherwise furnished by, the Ownerif any. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 2 contracts

Samples: legistarweb-production.s3.amazonaws.com, www.gateschili.org

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, rial e com W all be adjusted throughout or the he eve overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, mate donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the th Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www.psdschools.org

Cost of the Work. § 6.1 For purposes of this a Services Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the applicable Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: Agreement

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.. (Paragraphs deleted)

Appears in 1 contract

Samples: www.binghamton-ny.gov

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or contingenciesand contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www.ci.oswego.or.us

Cost of the Work. § 6.1 10.12.1 For purposes of this a Service Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead overhead, and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of to the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: cdn5-ss11.sharpschool.com

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include the contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value compensation of laborthe Construction Manager and Construction Manager’s consultants during the Construction Phase only, materialsincluding compensation for reimbursable expenses at the job site, and equipment, donated to, or otherwise furnished by, the Ownerif any. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-of- way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www.clarendonisd.net

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include the contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value compensation of laborthe Construction Manager and Construction Manager’s Consultants during the Construction Phase only, materialsincluding compensation for reimbursable expenses at the job site, and equipment, donated to, or otherwise furnished by, the Ownerif any. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or and contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www.allegancounty.org

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect A/E and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; A/E, the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Ownercosts.

Appears in 1 contract

Samples: Engineering Services

AutoNDA by SimpleDocs

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Landscape Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Landscape Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: mccmeetingspublic.blob.core.usgovcloudapi.net

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Ownercontingencies. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www.minnstate.edu

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all als, and equipment, elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, materi donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www.wiltonct.org

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: posgcd.org

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect Architect, which estimate and design have been previously approved by the Owner, and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-rights- of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www.cgcc.edu

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: boardmeetings.cvsd.net

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, labor including escalation for phased work or market conditions, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: resources.finalsite.net

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect Engineer and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; Engineer, the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www1.gcsnc.com

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or and contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: www.ci.oswego.or.us

Cost of the Work. § 6.1 For purposes of in this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include the contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value compensation of laborthe Construction Advisor and Construction Advisor’s Consultants during the Construction Phase only, materialsincluding compensation for reimbursable expenses at the job site, and equipment, donated to, or otherwise furnished by, the Ownerif any. The Cost of the Work does not include the compensation of the Architect; Architects, the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: geneseo.schoolboard.net

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of This Portion of the Project designed or specified by the Architect Consultant and shall include contractors’ construction general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the Design-Builder’s fee, costs of tests, or evaluations and reports required for the execution of the Work, the compensation of the Architect; Consultant, its sub-consultants or any other design professionals on the Project, the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Design-Builder, Architect, or Owner.

Appears in 1 contract

Samples: health.ucdavis.edu

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Owner’s consultants; Owner's Project management costs (including but not limited to any construction managers or project management consultants engaged by Owner); or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: campusservices.tulane.edu

Cost of the Work. § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct of all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; , the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; Work or other costs that are the responsibility of the Owner.

Appears in 1 contract

Samples: vusd.diligent.community

Time is Money Join Law Insider Premium to draft better contracts faster.