Control frames Sample Clauses

Control frames. Default MAC Header field settings for control frames are listed in Table 53. Specific MAC Header field settings and payload descriptions for each of the control frames are shown in the following subclauses. Table 53 —MAC Header field values for control frames Header field Value Protocol Version 0 Secure As defined in 7.2.1.2 ACK Policy 0 (No-ACK) Frame Type 1 (control frame) Frame Subtype Value from Table 54 Retry Reserved DestAddr DevAddr of the recipient SrcAddr DevAddr of the transmitter Sequence Control As described in 7.2.4 for Imm-ACK, B-ACK, CTS and NAK frames, Reserved otherwise Duration As described in 7.2.5.1 and 8.1.9.1 More Frames Reserved Access Method As described in 7.2.5.3 Table 54 lists valid values for the Frame Subtype field for control frames. Table 54 — Frame Subtype field encoding for control frames Value Control frame subtype Description 0 Imm-ACK Acknowledges correct receipt of the previously- received frame 1 B-ACK Acknowledges correct or incorrect receipt of one or more preceding frames 2 RTS Announces to a recipient device that a frame is ready for transmission and requests confirmation of ability to receive 3 CTS Responds to an RTS control frame that the recipient is able to receive 4 UDA Announces to neighbors of the transmitting device that the remainder of a reservation block it owns is available for use by other devices via PCA 5 UDR Announces to neighbors of the transmitting device that the remainder of a reservation block of which it is the target is available for use by other devices via PCA 7 Local Cycle Change Request Requests that one or more neighbors to change their local cycle indexes 8–13 Reserved Reserved 14 Application-specific At discretion of application owner 15 Reserved Reserved
AutoNDA by SimpleDocs

Related to Control frames

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Control and Monitoring Each Party shall provide or arrange for 24-hour control and monitoring of their portion of the Interconnection Facilities.

  • EVENTS OUTSIDE OUR CONTROL 7.1 We will not be liable or responsible for any failure to perform, or delay in performance of, any of Our obligations under these Terms that is caused by an Event Outside Our Control.

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Control Area Notification At least three months before Initial Synchronization Date, Interconnection Customer shall notify Distribution Provider in writing of the Control Area in which the Generating Facility will be located. If Interconnection Customer elects to locate the Generating Facility in a Control Area other than the Control Area in which the Generating Facility is physically located, and if permitted to do so by the relevant transmission tariffs, all necessary arrangements, including but not limited to those set forth in Article 7 and Article 8 of this GIA, and remote Control Area generator interchange agreements, if applicable, and the appropriate measures under such agreements, shall be executed and implemented prior to the placement of the Generating Facility in the other Control Area.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Data Input Control It will be possible to retrospectively examine and establish whether and by whom Personal Data have been entered, modified or removed from SAP data processing systems. Measures: • SAP only allows authorized personnel to access Personal Data as required in the course of their duty. • SAP has implemented a logging system for input, modification and deletion, or blocking of Personal Data by SAP or its subprocessors within the Cloud Service to the extent technically possible.

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract.

Time is Money Join Law Insider Premium to draft better contracts faster.