CONSTRUCTION - Install temporary excavation support and protection Sample Clauses

CONSTRUCTION - Install temporary excavation support and protection system in accordance with Publication 408. Be responsible for adequacy, safety and compliance with Traffic Control Plan. Ensure that the design is compliant with the approved Traffic Control Plan. All steel and wooden components may remain in place to pavement subgrade or 0.6 meters (2 feet) below finish grade, whichever is the higher elevation. Treated wood is not required unless it is within 2 meters (6 feet) of finish grade and is to remain in place. Pressure treat with chromate copper arsenate (CCA) to refusal. Finish grade is defined as top of pavement when a roadway is behind the temporary excavation support and protection system. Have a Professional Engineer, registered in the State; certify that the temporary excavation support system or open cut excavation has been installed as shown on the Professional Engineer's signed and sealed drawings. Submit the certification to the Representative within 3 working days of completion of the system.
AutoNDA by SimpleDocs

Related to CONSTRUCTION - Install temporary excavation support and protection

  • Delivery/Installation Instructions Due to the varying locations and circumstances involved in deliveries and installations, all deliveries and installations will be quoted on a project by project basis. All installation, labor, and or delivery charges must be shown as a separate line item on quotes and invoices. One of the following delivery methods must be specified on every Agency Purchase Order:

  • Construction of Public Improvements a. Upon satisfaction of the conditions set forth in Paragraph 2.1 and the notice requirement set forth below, Developer shall construct the Public Improvements at its own expense in accordance with this Agreement, the Final Plat, the Resolution, the Civil Engineering Construction Plans, the Town’s ordinances, resolutions and regulations and all other applicable laws and regulations. All Public Improvements shall be installed and constructed within the rights- of-way or easements dedicated to the Town. Unless otherwise approved by the Town in writing, all materials used for constructing the Public Improvements shall be materials set forth on the Town’s approved material list. Workmanship and materials shall be of good quality.

  • Construction Safety Prior to contract award, the successful bidder must provide a Certificate of Recognition or Letter of Good Standing issued by an occupational health and safety organization approved by the Workers’ Compensation Board of Nova Scotia.

  • Owner’s Construction Inspector Owner may from time to time in writing designate a person or firm as Owner's Construction Inspector under this Contract. The Owner’s Construction Inspector may be hired by Owner or hired under the Program Manager’s Contract or the Design Professional’s Contract and shall provide inspection services of the Work on behalf of the Owner. The presence of an Owner’s Construction Inspector does not relieve the Contractor of any of its responsibilities for quality control and independent testing set forth in the General Requirements. The Owner’s Construction Inspector has the authority to report any deviations from the Contract Documents directly to the Contractor’s superintendent at the job site for immediate action, and also to report same to the Program Manager or Design Professional, and Owner.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Construction Phase Part 1 –

  • BUILDER’S RISK FOR CONSTRUCTION RENOVATION PROJECTS If the project is CONSTRUCTION RENOVATION of an existing structure, and the State has already determined that Contractor will not be obligated to obtain and maintain Builder’s Risk insurance, then the following provisions apply:

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • CONSTRUCTION AND IMPROVEMENTS Concessionaire shall not affix, alter, or erect any permanent or temporary equipment, structures, buildings, or additions to the Concession Premises without first obtaining the prior written approval of Department.

Time is Money Join Law Insider Premium to draft better contracts faster.