Alpena Power Generation, L Sample Clauses

Alpena Power Generation, L. L.C. [Docket No. ER04–1004–002] Take notice that on November 5, 2004, Alpena Power Generation, L.L.C. (Alpena Generation) tendered for filing a second supplement to its application for market-based rate authority filed on July 9, 2004, as amended on August 27, 2004, in response to the Commission’s October 22, 2004, deficiency letter in Docket Nos. ER04–1004–000 and ER04– 1004–001. Alpena Generation states that copies of the filing were served on the public utility’s jurisdictional customers and the Michigan Public Service Commission. Comment Date: 5 p.m. eastern time on November 26, 2004.
AutoNDA by SimpleDocs

Related to Alpena Power Generation, L

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting the HUB Program at 000-000-0000 or toll-free in Texas at 0-000-000-0000.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Green Economy/Carbon Footprint a) The Supplier/Service Provider has in its bid provided Transnet with an understanding of the Supplier’s/Service Provider’s position with regard to issues such as waste disposal, recycling and energy conservation.

  • HARGA RIZAB Hartanah tersebut akan dijual “Dalam Keadaan Xxxxx Xxx” xxx tertakluk kepada satu harga rizab sebanyak RM669,000.00 (RINGGIT MALAYSIA: ENAM RATUS XXX ENAM PULUH SEMBILAN RIBU SAHAJA) xxx Syarat-syarat Jualan xxx tertakluk kepada kebenaran yang diperolehi oleh Pembeli dari Pemaju/Pemilik Tanah xxx Pihak Berkuasa yang lain, jika ada. DEPOSIT:- Semua penawar yang ingin membuat tawaran dikehendaki mendepositkan kepada Pelelong, sebelum lelongan 10% daripada harga rizab secara BANK DERAF sahaja atas nama BANK KERJASAMA RAKYAT MALAYSIA BERHAD xxx xxxx xxxx xxxxxx hendaklah dijelaskan dalam tempoh Sembilan Xxxxx (00) Hari. Bagi penawar atas talian sila rujuk Terma xxx Syarat serta cara pembayaran deposit di xxx.xxxxxxxxxxxxxxx.xxx KEBENARAN PINDAHMILIK: Harta tersebut akan tertakluk kepada kebenaran pindahmilik diperolehi oleh pembeli berjaya daripada Pemaju xxx/atau mana-mana pihak berkuasa lain (jika berkenaan). Nota: Butir-butir hartanah adalah berdasar Laporan Penilaian xxx perjanjian-perjanjian pembiayaan yang mana berdasarkan pengetahuan kami adalah benar. Walaubagaimanapun pembida hendaklah membuat xxxxxx xxxxx atas hakmilik induk di pejabat tanah xxx/atau pihak berkuasa berkenaan. Perjanjian ini tidak akan menjadi terbatal sekiranya terdapat perbezaan berkenaan butir-butir hartanah Untuk mendapatkan butir-butir selanjutnya, xxxx berhubung dengan Tetuan Suhaimi Yahya & Co Peguamcara bagi Pihak Pemegang Serahhak/Bank di Xx. 0-0, Xxxxx Xxxxxx Xxxxxx 00, Wangsa Link, Xxxxxx Xxxx, 00000 Xxxxx Xxxxxx. (Ruj No. SY/BKRM(PJS)/LIT/010/2021/L) Tel No: 00-00000000, Fax No. 00-00000000, atau Pelelong yang tersebut di bawah ini:- TETUAN ESZAM AUCTIONEER SDN BHD (760902-H) MOHD NIZAM BIN XXXX XXXXXX (P.J.K) Suite B-15-03, Tingkat 15, Blok B, Megan Avenue 2, (Pelelong Berlesen) 00, Xxxxx Xxx Xxxx Xxxx, 50450 Kuala Lumpur TEL NO: 00-0000000, H/P NO: 000-0000000/000-0000000 FAX NO: 00-0000000 E-mail: xxxxxxxxxxxxxxx@xxxxx.xxx Web site : xxx.xxxxxxxxxxxxxxx.xxx Rujukan kami : EZ/LACA/BKRMB/212/2021/MNS/mas CONDITIONS OF SALE

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.