Advancing Efficiency Savings and Clean Energy Generation Sample Clauses

Advancing Efficiency Savings and Clean Energy Generation the Clean Energy Results Program. The Clean Energy Results Program (CERP) is an innovative initiative that integrates goals for creating sources of renewable energy and encouraging energy-efficient development with MassDEP’s permitting and assistance functions. This joint initiative of MassDEP and the Massachusetts Department of Energy Resources (DOER) with assistance from the Massachusetts Clean Energy Center (CEC) encourages the development of clean-energy projects in Massachusetts. It is designed to focus the scientific expertise of MassDEP and DOER in an effort to smooth out any technical and regulatory barriers, assist and improve the siting and permitting processes related to these projects. Through this program, the Commonwealth will continue to provide technical assistance and establish clear and predictable permitting pathways for renewable energy. MassDEP will continue to harness its expertise to bolster energy efficiency and renewable energy at regulated sites and facilities and expand activities to: • Encourage and support installation of innovative technological applications and development to scale through piloting and efficient permitting pathways for technologies advancing both energy efficiency and renewable energy generation. • Build awareness of, and support climate readiness benefits to, efficiency and clean energy generation projects. • Ensure safe siting and use of renewable energy sources (wind, solar, anaerobic digesters, hydropower, sustainable biomass, etc.) • Encourage the expansion of recycling/conversion of organics to renewable energy (via anaerobic digestion), with the goal of diverting 800,000 tons per year of organic material from landfills and incinerators by 2030, and increasing energy production from aerobic and anaerobic digestion to 50 megawatts (MW) (from under 10 MW today). • Support the installation of new solar photovoltaic on underutilized contaminated land and brownfields, and on closed and capped municipal and private landfills, to create green jobs and tax revenue benefitting Massachusetts communities. • Expand energy management programs for wastewater and drinking water plants to meet the goal of achieving zero-net energy drinking water and wastewater treatment facilities.
AutoNDA by SimpleDocs

Related to Advancing Efficiency Savings and Clean Energy Generation

  • Energy Efficiency The contractor shall comply with all mandatory standards and policies relating to energy efficiency which are contained in the energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub.L. 94-163) for the State in which the work under this contract is performed.

  • PIPELINE SERVICE FUND The Employer shall deduct from each employee covered by this Agreement twenty-five cents ($0.25) for each hour of work earned and remit it monthly to the Pipeline Service Fund.

  • Allocation and use of scarce resources Any procedures for the allocation and use of scarce resources, including frequencies, numbers and rights of way, will be carried out in an objective, timely, transparent and non-discriminatory manner. The current state of allocated frequency bands will be made publicly available, but detailed identification of frequencies allocated for specific government uses is not required.

  • Resource Adequacy (a) During the Delivery Term, Seller grants, pledges, assigns and otherwise commits to Buyer all of the Project’s Contract Capacity, including Capacity Attributes from the Project, to enable Buyer to meet its Resource Adequacy or successor program requirements, as the CPUC, CAISO and/or other regional entity may prescribe, including submission of a Supply Plan or Resource Adequacy Plan (“Resource Adequacy Requirements”). From the Execution Date, and for the duration of the Delivery Term, Seller shall take all commercially reasonable actions, including complying with all applicable registration and reporting requirements, and execute any and all documents or instruments necessary to enable Buyer to use all of the capacity of the Project, including Capacity Attributes, to be committed by Seller to Buyer pursuant to this Agreement to meet Buyer’s Resource Adequacy Requirements during the Delivery Term.

  • Renewable Energy Credits 5.01. Customer shall offer PMPA and/or Utility a first right of refusal before selling or granting to any third party the right to the Green Attributes associated with its customer-owned renewable generation that is interconnected to Utility’s electric distribution system. The term Green Attributes shall include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsets, and allowances, however entitled, attributable to the generation of electricity from the customer owned-renewable generation and its displacement of conventional energy generation.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Community Mental Health Center Services Assertive Community Treatment Staffing Full Time Equivalents Community Mental Health Center March 2021 December 2020 Nurse Masters Level Clinician/or Functional Support Worker Peer Specialist Total (Excluding Psychiatry) Psychiatrist/Nurse Practitioner Total (Excluding Psychiatry) Psychiatrist/Nurse Practitioner 01 Northern Human Services - Wolfeboro 1.00 0.00 0.00 0.57 6.81 0.27 8.27 0.25 01 Northern Human Services - Berlin 0.34 0.31 0.00 0.00 3.94 0.14 4.17 0.14 01 Northern Human Services - Littleton 0.00 0.14 0.00 0.00 3.28 0.29 3.31 0.29 02 West Central Behavioral Health 0.60 1.00 0.00 0.00 5.40 0.30 5.90 0.30 03 Lakes Region Mental Health Center 1.00 1.00 0.00 1.00 5.00 0.40 7.00 0.38 04 Riverbend Community Mental Health Center 0.50 1.00 6.90 1.00 10.40 0.50 10.50 0.50 05 Monadnock Family Services 1.91 2.53 0.00 1.12 11.17 0.66 10.32 0.62 06 Greater Nashua Mental Health 1 1.00 1.00 3.00 1.00 7.65 0.15 8.50 0.15 06 Greater Nashua Mental Health 2 1.00 1.00 4.00 1.00 8.65 0.15 8.50 0.15 07 Mental Health Center of Greater Manchester-CTT 1.33 10.64 2.00 0.00 19.95 1.17 21.61 1.21 07 Mental Health Center of Greater Manchester-MCST 1.33 9.31 3.33 1.33 19.95 1.17 25.27 1.21 08 Seacoast Mental Health Center 1.00 1.10 5.00 1.00 10.10 0.60 10.10 0.60 09 Community Partners 0.50 0.00 3.40 0.88 7.28 0.70 7.41 0.70 10 Center for Life Management 1.00 0.00 2.28 1.00 6.71 0.46 6.57 0.46 Total 12.51 29.03 29.91 9.33 126.29 6.96 137.43 6.96 2b. Community Mental Health Center Services: Assertive Community Treatment Staffing Competencies Community Mental Health Center Substance Use Disorder Treatment Housing Assistance Supported Employment March 2021 December 2020 March 2021 December 2020 March 2021 December 2020 01 Northern Human Services - Wolfeboro 1.27 1.27 5.81 6.30 0.00 0.40 01 Northern Human Services - Berlin 0.74 0.74 3.29 3.29 0.00 0.23 01 Northern Human Services - Littleton 1.43 1.29 2.14 2.14 1.00 1.00 02 West Central Behavioral Health 0.20 0.20 4.00 0.40 0.60 0.60 03 Lakes Region Mental Health Center 1.00 3.00 5.00 7.00 2.00 2.00 04 Riverbend Community Mental Health Center 0.50 0.50 9.40 9.50 0.50 0.50 05 Monadnock Family Services 1.69 1.62 4.56 4.48 0.95 1.18 06 Greater Nashua Mental Health 1 6.15 7.15 5.50 6.50 1.50 1.50 06 Greater Nashua Mental Health 2 5.15 5.15 6.50 6.50 0.50 0.50 07 Mental Health Center of Greater Manchester-CCT 14.47 15.84 13.96 15.62 2.66 2.66 07 Mental Health Center of Greater Manchester-MCST 6.49 7.86 15.29 19.28 1.33 2.66 08 Seacoast Mental Health Center 2.00 2.00 5.00 5.00 1.00 1.00 09 Community Partners 1.20 1.20 4.50 4.50 1.00 1.00 10 Center for Life Management 2.14 2.14 5.42 5.28 0.29 0.29 Total 44.43 49.96 90.37 99.39 13.33 15.52 Revisions to Prior Period: None. Data Source: Bureau of Mental Health CMHC ACT Staffing Census Based on CMHC self-report. Notes: Data compiled 04/26/2021. For 2b: the Staff Competency values reflect the sum of FTEs trained to provide each service type. These numbers are not a reflection of the services delivered, but rather the quantity of staff available to provide each service. If staff are trained to provide multiple service types, their entire FTE value is credited to each service type.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

Time is Money Join Law Insider Premium to draft better contracts faster.