Water system plan (WSP) definition

Water system plan (WSP) means a water system plan developed and approved under WAC 246-290-100.

Related to Water system plan (WSP)

  • Water System or “water works” means all public facilities for securing, collecting, storing, pumping, treating, and distributing water.

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Wastewater System means a system of wastewater collection, treatment,

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Public water system means a system for the provision of water for human consumption through pipes or other constructed conveyances that has 15 or more service connections or regularly serves at least 25 individuals daily at least 60 days out of the year.

  • Sewer System means pipelines or conduits, pumping stations, force mains, vehicles, vessels, conveyances, injection wells, and all other constructions, devices, and appliances appurtenant thereto used for conducting sewage or industrial waste or other wastes to a point of ultimate disposal or disposal to any water of the state. To the extent that they are not subject to section 402 of the federal Water Pollution Control Act, ditches, pipes, and drains that serve only to collect, channel, direct, and convey nonpoint runoff from precipitation are not considered as sewer systems for the purposes of this part of this division.

  • Community water system means a public water system which serves at least 15 service connections used by year-round residents or regularly serves at least 25 year-round residents.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.

  • Noncommunity water system means a public water system that is not a community water system.

  • Low water pressure means water pressure below the regulatory reference level which is the minimum pressure when demand on the system is not abnormal.

  • Hot water means water at a temperature of 110°F. (43°C.) or higher.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Contractor System means the information and communications technology system used by the Contractor in performing the Services including the Software, the Contractor Equipment and related cabling (but excluding the Authority System).

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Service Areas means those areas within the Building used for stairs, elevator shafts, flues, vents, stacks, pipe shafts and other vertical penetrations (but shall not include any such areas for the exclusive use of a particular tenant).

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Gathering System means that portion of Gatherer’s pipeline system, including all appurtenances thereto, related to the provision of gathering and transportation services provided by Gatherer pursuant to this tariff.

  • Supplier System means the information and communications technology system used by the Supplier in performing the Services including the Software, the Equipment and related cabling (but excluding the Customer System);

  • Sanitary Sewer System means all facilities, includ- ing approved LOSS, used in the collection, transmission, storage, treatment, or discharge of any waterborne waste, whether domestic in origin or a combination of domestic, commercial, or industrial wastewater. LOSS are only consid- ered sanitary sewer systems if they are designed to serve urban densities. Sanitary sewer system is also commonly known as public sewer system.

  • mining areas means the areas delineated and coloured red on the Plan marked “A” initialled by or on behalf of the parties hereto for the purposes of identification;