Test Activation definition

Test Activation has the meaning given to it in Schedule 2.

Examples of Test Activation in a sentence

  • Test Activation Payments compensate a Participant for the Quantity Delivered/Reduced provided during a Test Activation.

  • In the event the Contracted DER fails to successfully complete the first Test Activation, the Capacity Charge shall be applicable, and the DSO may, in its discretion, carry out a second Test Activation at any time prior to the Commitment Period End Date.

  • Failure to successfully complete the second Test Activation is a Participant Default and may result in the immediate termination of this Contract.

  • The DSO may also, in its discretion, require the Contracted DER to a undergo a second Test Activation.

  • The Participant will incur a Capacity Charge in the event the Contracted DER fails a Test Activation.

  • However, a higher proportion of individuals who failed only the asset test (24.2 percent) are nondisabled adults age 18 to 49 not living with children under age 5 compared with the proportion of individuals who failed both an income and asset test (15.0 percent).

  • During (i) an event of Force Majeure, or (ii) a Planned Outage or a Forced Outage for which the DSO has received an Outage Notice in accordance with the prescribed timelines; the Test Activation or Test Deployment shall only apply to that portion of the Contracted DER that is available, and in the event no portion of the Contracted DER is available, no Test Activation or Test Deployment shall be issued by the DSO for the Contracted DER.

  • The mean firing times for 1 and are beyond the range of the figure.

  • The total number of Activation Notices issued to a Participant during the Commitment Period, which for clarity, exclude Test Activation Notices, shall not exceed ten (10), and the total DER Activation Hours for the Contracted DER shall not exceed forty (40) hours for the Commitment Period.

  • For Gas-fired Resources, Storage Resources or Demand Response Resources (C&I), Test Activations will be evaluated at every 5-minute interval in a Test Activation Hour.

Related to Test Activation

  • Activation or "Activated" shall mean the date on which (i) with respect to the Limited Partnership, the Limited Partnership is formed and (ii) with respect to the Production Partnership, the Limited Partnership shall have made its capital contribution to the Production Partnership.

  • SOW means the document specifying, without limitation, the scope, objective, and time frame of the Work that Supplier will perform for Cisco.

  • Service Drop means the overhead service conductors from the service point to the connection to the service-entrance conductors at the building or other structure.

  • Deactivation means the retirement or mothballing of a generating unit governed by Tariff, Part V. Deactivation Avoidable Cost Credit:

  • Product Schedule means PTC’s standard order form entitled “PTC Product Schedule” (including all schedules, attachments and other document(s) specifically referenced therein) or such alternative order form as may be submitted by Customer and accepted by PTC, in each case that specifies (i) the Licensed Products and/or Services ordered; and (ii) for Licensed Products, the installation address (including the Designated Country) and the Licence Term.

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Synchronous Optical Network (SONET) is an optical interface standard that allows inter-networking of transmission products from multiple vendors. The base rate is 51.84 Mbps (“OC-1/STS-1”) and higher rates are direct multiples of the base rate, up to 13.22 Gbps.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Synchronous Optical Network (SONET means the optical interface standard that allows inter-networking of transmission products from multiple vendors. The base rate is 51.84 Mbps (“OC 1/STS 1”) and higher rates are direct multiples of the base rate, up to 13.22 Gbps.

  • Manufacturing operation means a process in which materials are changed, converted, or transformed into a different state or form from which they previously existed and includes refining materials, assembling parts, and preparing raw materials and parts by mixing, measuring, blending, or otherwise committing such materials or parts to the manufacturing process. "Manufacturing operation" does not include packaging.

  • Development Phase means the period before a vehicle type is type approved.

  • Manufacturing Site means a location where a manufacturing

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Maintenance Schedule means a document which describes the specific scheduled maintenance tasks and their frequency of completion necessary for the safe operation of those aircraft to which it applies;

  • Manufacturing Costs means the costs of Processing that generate Manufacturing Proceeds received by Grantor.

  • Work Order means an individually negotiated document that is executed by both Parties and which authorizes a Project, if any, in an indefinite quantity Contract.

  • Manufacturing Facility means buildings and structures, including machinery and equipment, the primary purpose of which is or will be the manufacture of tangible goods or materials or the processing of such goods or materials by physical or chemical change.

  • Manufacturing Facilities means facilities engaged in the mechanical or chemical transformation of materials or substances into new products and shall include:

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Collaborative agreement means a voluntary, written, or electronic arrangement between one

  • Increased Facility Activation Notice a notice substantially in the form of Exhibit G.

  • Assistive technology service means any service that directly assists a child with a disability in the selection, acquisition, or use of an assistive technology device. The term includes:

  • Task Order means a separate order issued under this Contract.

  • Preventative Maintenance means the routine, customary or regular course of procedure related to the care or upkeep of an existing Department facility or system, which may also include inspection services provided as part of a preventative maintenance program. Preventive maintenance is conducted to keep equipment working and/or extend the life of the equipment.

  • Module means specific portion of the Application Software designated as such in the Documentation made available to the Customer under the Notification Form.

  • Net metering customer means a customer of the electric distribution company