Examples of Solar Photovoltaic Project in a sentence
We were the developer, and we are now the operator, of a 50 MW Solar Photovoltaic Project in 200 MW Kasaragod Solar Park in the State of Kerala.
The tariff was fixed at ` 15 per unit and` 11 per unit for the Solar Photovoltaic Project (SPV) and Solar Thermal (ST) projects respectively for the initial 12 years starting from the date of COD and thereafter at ` 5 per unit and ` 4 per unit for SPV and ST projects respectively from 13th year to 25th year.
Review the adequacy of the insurance contracts, O&M plan and contracts.Moserbaer 20 MW Solar Photovoltaic Project in Rajkot The typical scope of work included the assessment of cconceptual design, power purchase agreements, and turnkey.
The certification contained herein shall be signed by an officer of the proposer having authority to execute the Agreement.
Greenwald, to approve Resolution No. 09-171- Authorizing the City Manager to Execute a Power Purchase Agreement and Associated Financing Documents with SunEdison, LLC, for the City of Davis Solar Photovoltaic Project.
The same is the case for the probability limits [the formulas (fi0) and (fi3)].
Construction may be undertaken from both the landward and seaward side of the seawall.A range of options for constructing the piling works on the seawall have been identified and a credible assessment of the working method and working spaces has been developed and are presented in Alta’s construction methodology for resource consent report (Alta, 2018) and are summarised below.
The questionnaires have been distributed to energy contacts in SOPAC & UNESCAP member countries and other institutions.At present the contents of a pilot training programme on Solar Photovoltaic Project Development is being prepared.
The Respondent No 3, issued a „Request for Selection‟ (hereinafter referred to as „RfS‟) dated 16.03.2013 for Solar Power Developers (hereinafter referred to as „SPDs‟) for development of 750MW (3 x 250MW) Grid connected Ground Mounted Solar Photovoltaic Project split into three units of 250MW capacity each, identified as Unit 1, Unit 2 and Unit 3.
The two MW AC power mounted solar system in Fontana, California is considered as the first installed and interconnected system in Southern California Edison (SCE) Solar Photovoltaic Project (SPVP).