Problem Priorities definition

Problem Priorities classify the criticality of a problem at a Client site. Problem Priorities are assigned at the time of Client's initial contact with Fry. Problem Priorities may be changed based upon new information or Client situation. Problem Priorities refer the classification of the Incident, not any resulting Error which may be identified during the resolution of the Incident. Problem Priorities are classified as follows:
Problem Priorities classify the criticality of a problem at a customer site. Problem Priorities are assigned at the time of 3Com's initial contact with Company. Problem Priorities may be changed based upon new information or customer situation. Problem Priorities are defined the same as Errors, but refer the classification of the incident, not any resulting Error which may be identified during the resolution of the incident.
Problem Priorities. XJ uses three problem priority levels to indicate the impact and importance of problems as follows:

Examples of Problem Priorities in a sentence

  • Problem Priorities" classify the criticality of a problem at a Client site.

  • Problem Priorities are assigned at the time of Client's initial contact with Fry.

  • Problem Priorities may be changed based upon new information or Client situation.

  • The second visit featured interviews and on-the-ground research to follow up on the January fieldwork, including an assessment of PRISSMA’s services and how they relate to the strategic focus areas identified.In-person Interviews The primary objective of the interviews was to understand potential clients’ needs regarding consulting, financial intermediation, and capacity building services for project planning, financing, and management provided by PRISSMA.

  • Problem Priorities are assigned at the time of 3Com's initial contact with Company.

  • Private investors, fearing nonpayment by the State Elec- tricity Boards, insisted on arrangements that guaranteed purchase of electricity by state governments with additional guarantees from the central government.

  • Problem Priorities" classify the criticality of a problem at a customer site.

  • In this case, the agent would face negative initial wealth, which is not sustainable in equilibrium.Before going into general equilibrium analysis, we do comparative analysis to reckon the sensi- tivity of the excessively leveraged initial portfolios to price changes in a partial equilibrium frame- work.

  • For the catchments specifically identified in the CD by the USEPA, and for Catchments identified a Problem Priorities during the Reporting Period, the detailed status of each is included in the IDDE Plan in Appendix B.

  • Synthesis Results of Product Problem Priorities To see the results of the priority synthesis of each respondent, it can be seen in Figure 8 below: Weak MMQ PortfoliosWeak SynergyBuying and Selling OrientationFigure 8.

Related to Problem Priorities

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Coordinated licensure information system means an integrated process for collecting, storing, and sharing information on nurse licensure and enforcement activities related to nurse licensure laws that is administered by a nonprofit organization composed of and controlled by licensing boards.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • Contractor information system means an information system belonging to, or operated by or for, the Contractor.

  • Provider Platform Application means an application or a set of related functionality deployed on a Platform Cloud Service, created by Provider using the Tools to run on or with the Platform Cloud Service for access by End Users.

  • Wastewater treatment system means any equipment, plants,

  • Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

  • Stormwater management system means any equipment, plants,

  • Security Documentation means all documents and information made available by Google under Section 7.5.1 (Reviews of Security Documentation).

  • Interoperability means the ability of a CenturyLink OSS Function to process seamlessly (i.e., without any manual intervention) business transactions with CLEC's OSS application, and vice versa, by means of secure exchange of transaction data models that use data fields and usage rules that can be received and processed by the other Party to achieve the intended OSS Function and related response. (See also Electronic Bonding.)

  • Nonpoint source pollution means pollution such as sediment, nitrogen, phosphorous, hydrocarbons, heavy metals, and toxics whose sources cannot be pinpointed but rather are washed from the land surface in a diffuse manner by stormwater runoff.

  • Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.

  • Implementation Schedule means the Implementation Schedule in Section VII of the tendering documents.

  • Environmental Safeguards means the principles and requirements set forth in Chapter V, Appendix 1, and Appendix 4 (as applicable) of the SPS;

  • Maintenance Programme shall have the meaning set forth in Clause 14.3; “Maintenance Period” shall have the meaning set forth in Clause 14.1; “Maintenance Requirements” shall have the meaning set forth in Clause 14.2;

  • Wastewater Treatment Works means an arrangement of devices and structures for treating wastewater, industrial wastes, and sludge. Sometimes used as synonymous with "waste treatment plant" or "wastewater treatment plant" or "pollution control plant".

  • Contractor Intellectual Property means any intellectual property owned by Contractor and developed independently from the Services.

  • Reservation System means the Contributor's Reservation Terminal and Reservation System equipment and software, if any.

  • Flood Documentation means, with respect to each Mortgaged Property located in the United States of America or any territory thereof, (i) a completed “life-of-loan” Federal Emergency Management Agency standard flood hazard determination (to the extent a Mortgaged Property is located in a Special Flood Hazard Area, together with a notice about Special Flood Hazard Area status and flood disaster assistance duly executed by the Borrower and the applicable Loan Party relating thereto) and (ii) a copy of, or a certificate as to coverage under, and a declaration page relating to, the insurance policies required by Section 5.02(c) hereof and the applicable provisions of the Security Documents, each of which shall (A) be endorsed or otherwise amended to include a “standard” or “New York” lender’s loss payable or mortgagee endorsement (as applicable), (B) name the Collateral Agent, on behalf of the Secured Parties, as additional insured and loss payee/mortgagee, (C) identify the address of each property located in a Special Flood Hazard Area, the applicable flood zone designation and the flood insurance coverage and deductible relating thereto and (D) be otherwise in form and substance reasonably satisfactory to the Collateral Agent.

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Access Application means an application for Access Rights as described in section 3.7;

  • Wastewater treatment plant means a facility designed and constructed to receive, treat, or store waterborne or liquid wastes.

  • Data Protection Impact Assessment means an assessment by the Controller of the impact of the envisaged processing on the protection of Personal Data;

  • Wastewater collection system means the sewer and pumping system used for the collection and conveyance of domestic, commercial and industrial wastewater; and

  • Leak-detection system means a system capable of detecting the failure of either the primary or secondary containment structure or the presence of a release of hazardous waste or accumulated liquid in the secondary containment structure. Such a system must employ operational controls (e.g., daily visual inspections for releases into the secondary containment system of aboveground tanks) or consist of an interstitial monitoring device designed to detect continuously and automatically the failure of the primary or secondary containment structure or the presence of a release of hazardous waste into the secondary containment structure.