Oklahoma production cost definition

Oklahoma production cost means that portion of total
Oklahoma production cost means that portion of total production costs which are incurred with any qualified vendor. “Total production cost” includes, but is not limited to:
Oklahoma production cost means that portion of total production costs which are incurred with any qualified vendor;

Related to Oklahoma production cost

  • Production Costs means those costs and expenditures incurred in carrying out Production Operations as classified and defined in Section 2 of the Accounting Procedure and allowed to be recovered in terms of Section 3 thereof.

  • Formation Cost means preliminary expenses relating to regulatory and registration fees of the Scheme, flotation expenses of the Scheme, expenses relating to authorization of the Scheme, execution and registration of the Constitutive Documents, legal costs, printing, circulation and publication of this Offering Document, announcements describing the Scheme and all other expenses incurred until the end of the Initial Period.

  • Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.

  • Additional Transportation Cost means the actual cost incurred for one-way Economy Transportation by Common Carrier reduced by the value of an unused travel ticket.

  • Transportation Costs means a component of the Charges, comprising those charges payable to the TNO and/or DNO for the use of their networks as applicable from time to time under the Industry Agreements including those charges more specifically referred to as “DUoS” and “TNUoS” and specified as “Included in the Unit Rate”, “Fixed” or “Pass-Through” in the Quotation Document or as otherwise notified to you as payable during the Supply Contract from time to time;

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • FOR Destination costs means the cost of equipment and material at the consignee’s stores. The cost is exclusive of Excise duty, Sales Tax and other Local Taxes, but is inclusive of packing, forwarding and insurance and freight charges.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Production Area means that part of the animal feeding operation that includes the animal confinement area, the manure storage area, the raw materials storage area, and the waste containment areas. The animal confinement area includes, but is not limited to, open lots, housed lots, feedlots, confinement houses, stall barns, free stall barns, milkrooms, milking centers, egg washing or egg processing areas, areas used for the storage and disposal/treatment of mortalities, cowyards, barnyards, medication pens, walkers, animal walkways, and stables. The manure storage area includes, but is not limited to, lagoons, runoff ponds, storage sheds, stockpiles, under-house or pit storages, liquid impoundments, static piles, and composting piles. The raw materials storage area includes, but is not limited to, feed silos, and silage bunkers. The waste containment area includes, but is not limited to, settling basins and areas within berms and diversions which separate uncontaminated stormwater.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.

  • Supply Point means the point of connection between the licensed network and your apparatus or equipment.

  • Manufacturing Cost means ***

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Salvaging means the lawful and controlled removal of reusable materials from solid waste.

  • CO2 means carbon dioxide.

  • Acquisition Cost means the cost to acquire a tangible capital asset including the purchase price of the asset and costs necessary to prepare the asset for use. Costs necessary to prepare the asset for use include the cost of placing the asset in location and bringing the asset to a condition necessary for normal or expected use.