Mainline Expansion Phase IV Surcharge definition

Mainline Expansion Phase IV Surcharge means the tariff surcharge component for the fourth phase of the Mainline Expansion Project, as described in the Mainline Expansion Phase IV Term Sheet and to be agreed to by XXXX.

Related to Mainline Expansion Phase IV Surcharge

  • Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.

  • Debt service extension base means an amount equal to that

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Lateral expansion means a horizontal expansion of the waste boundaries of an existing MSW landfill. A lateral expansion is not a modification unless it results in an increase in the design capacity of the landfill.

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Development Phase means the period before a vehicle type is type approved.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Project Year means the 12 month period beginning from the Effective Date and ending 12 months thereafter and each successive 12 month period following thereafter;

  • PJM Region Installed Reserve Margin means the percent installed reserve margin for the PJM Region required pursuant to RAA, Schedule 4.1, as approved by the PJM Board. PJM Region Peak Load Forecast:

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Maintenance Costs means parts and materials, sublet and labour costs of a qualified licensed mechanic for the maintenance of the Revenue Service Vehicles, but shall not include costs associated with interior and exterior transit advertising signs and non-mechanical servicing of Revenue Service Vehicles such as fuelling, clearing fareboxes, cleaning and painting wheel rims, vehicle washing and other work performed by a serviceman; and,

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Development Project means a project for the development of land within a

  • Scheduled Project Completion Date shall have the meaning specified in Section 6.3 (c);

  • AMPS Basic Maintenance Amount, as of any Valuation Date, means the dollar amount equal to (i) the sum of (A) the product of the number of shares of AMPS and Other AMPS Outstanding on such Valuation Date multiplied by the sum of (a) $25,000 and (b) any applicable redemption premium attributable to the designation of a Premium Call Period; (B) the aggregate amount of cash dividends (whether or not earned or declared) that will have accumulated for each share of AMPS and Other AMPS Outstanding, in each case, to (but not including) the end of the current Dividend Period that follows such Valuation Date in the event the then current Dividend Period will end within 49 calendar days of such Valuation Date or

  • Start-Up Costs means all fees, costs, and expenses incurred in connection with establishing the State Mitigation Trust and the Indian Tribe Mitigation Trust and setting them up for operation. Start-up costs shall not include the cost of premiums for insurance policies.

  • Maintenance area means any geographic region of the United States previously designated nonattainment pursuant to the CAA Amendments of 1990 and subsequently redesignated to attainment subject to the requirement to develop a maintenance plan under §175A of the CAA, as amended.

  • Project area budget means a multiyear projection of annual or cumulative

  • Annular space means the space between the casing and the walls of the borehole or outer casing, or the space between a liner pipe and well casing.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Redevelopment project means a specific construction project

  • Stand Alone System Upgrade Facilities means System Upgrade Facilities that a Developer may construct without affecting day-to-day operations of the New York State Transmission System during their construction. NYISO, the Connecting Transmission Owner and the Developer must agree as to what constitutes Stand Alone System Upgrade Facilities and identify them in Appendix A to this Agreement.

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.