Start-Up Costs definition

Start-Up Costs means all fees, costs, and expenses incurred in connection with establishing the State Mitigation Trust and the Indian Tribe Mitigation Trust and setting them up for operation. Start-up costs shall not include the cost of premiums for insurance policies.
Start-Up Costs means the unit costs to bring the boiler, turbine and generator from shutdown conditions to the point after breaker closure which is typically indicated by telemetered or aggregated state estimator megawatts greater than zero and is determined based on the cost of start fuel, total fuel-related cost, performance factor, electrical costs (station service), start maintenance adder, and additional labor cost if required above normal station xxxxxxx. Start-Up Costs can vary with the unit offline time being categorized in three unit temperature conditions: hot, intermediate and cold.
Start-Up Costs means the unit costs to bring the boiler, turbine and generator from shutdown conditions to the point after breaker closure which is typically indicated by telemetered or aggregated state estimator megawatts greater than zero and is determined based on the cost of start fuel, total fuel-related cost, performance factor, electrical costs (station service), start maintenance adder, and additional labor cost if required above normal station manning. Start-Up Costs can vary with the unit offline time being categorized in three unit temperature conditions: hot, intermediate and cold.

Examples of Start-Up Costs in a sentence

  • The CAISO will determine the IFM Start-Up Costs for Multi-Stage Generating Resources based on the CAISO-committed MSG Configuration.

  • For Multi-Stage Generating Resources, the Scheduling Coordinator must provide Start-Up Costs for each MSG Configuration into which the resource can be started.

  • The elections are independent; that is, a Scheduling Coordinator electing either the Proxy Cost option or Registered Cost option for Start-Up Costs may make a different election for Minimum Load Costs.

  • Virtual Bids do not include Start-Up Costs or Minimum Load Costs.

  • Other System Resources are not eligible to recover Start-Up Costs and Minimum Load Costs.


More Definitions of Start-Up Costs

Start-Up Costs means those costs such as, but not limited to, legal fees, filing fees, furniture, fixtures, equipment and facility costs incurred by a school for the nine-month period prior to receiving Department approval to operate as an approved private school for students with disabilities. A salary is not an allowable start-up cost.
Start-Up Costs means the acquisition cost associated with the project and related to furnishing and equipping a building for ordinary business functions, including computers, nonrecurring costs of fixed telecommunication equipment, furnishings, office equipment, and the relocation of out-of-state equipment, as verified and approved by the authority in accordance with KRS 154.23-040;
Start-Up Costs means all expenditures classified as syndication or organizational expenses under Section 709 of the Code or as start-up expenditures under Section 195 of the Code, but only to the extent such costs or expenditures are treated as amortizable costs or Code Section 705(a)(2)(B) expenditures for purposes of maintaining Capital Accounts pursuant to Section 1.704-1(b)(2)(iv)(i)(2) of the Regulations.
Start-Up Costs means costs such as, but not limited to, legal fees, filing fees, furniture, fixtures, equipment, and facility costs incurred by an APSSD for the nine-month period prior to receiving Department approval to operate as an APSSD. A salary is not an allowable start-up cost.
Start-Up Costs means costs incurred to furnish and equip a facility for an economic development project, including costs incurred for:
Start-Up Costs. (as such term is defined in SOP 98-5 published by the American Institute of Certified Public Accountants) related to the acquisition, opening and organizing of new Restaurants, such costs including, without limitation, the cost of feasibility studies, staff-training and recruiting, and travel costs for employees engaged in such start-up activities.
Start-Up Costs means costs incurred for the activities performed under Phase IA, IB and 2 of Track I and IA, IB and 2 of Track 2 as further described in Exhibit A