Forest Resource and Management Evaluation System definition

Forest Resource and Management Evaluation System or “FRAMES” means State Forests of NSW statewide forest resource inventory, growth modelling, simulation and harvest scheduling system for New South Wales’ public native forest resource. This system will be described in a document to be published within three months of the date of this Agreement (see Attachment 5);
Forest Resource and Management Evaluation System or “FRAMES” means State Forests the Forestry Corporation of NSW statewide forest resource inventory, growth modelling, simulation and harvest scheduling system for New South Wales’ public native hardwood forest resource. This system will be described in a document to be published within three months of the date of this Agreement (see Attachment 5);
Forest Resource and Management Evaluation System or “FRAMES” means State Forests of New South Wales’ the Forestry Corporation of NSW statewide forest resource inventory, growth modelling, simulation and harvest scheduling system for New South Wales’ public native hardwood forest resource. This system is documented in the project reports Strategic Inventory, Biometric Models, Yield Simulator, Strategic Yield Scheduler and Application of Protective Measures and Forest Practices into a Quantitative Database for the Southern region;

Examples of Forest Resource and Management Evaluation System in a sentence

  • Note: As at the date of this approval, the Forest Resource and Management Evaluation System referred to in paragraph (b) of the above subclause does not enable predictions to be made on a single compartment basis.

  • Strategic Yield Scheduler - Upper and Lower North East Region – A project undertaken as part of the NSW Comprehensive Regional Assessments” (Forest Resource and Management Evaluation System Technical Committee, New South Wales and Commonwealth Governments, 1999).

  • To do this, a strategic-scale modelling assessment and a tactical-scale field assessment will be undertaken: Strategic-scale modelling – this uses FCNSW’s Forest Resource and Management Evaluation System (FRAMES).

  • With regard to sustainable timber supply, the RFA indicates 95.6 In accordance with clause 46(f) develop and implement an inventory system for regrowth forests and review the calculation of Sustainable Yield, using methods consistent with Attachment 11 and the principles and processes used in the Forest Resource and Management Evaluation System (FRAMES), in time for the first RFA review; FCNSW have never accepted the methods developed by the FRAMES committee.

  • FCNSW models sustainable yield over a 100-year period using the Forest Resource and Management Evaluation System (FRAMES) modelling system.

Related to Forest Resource and Management Evaluation System

  • Stormwater management system means any equipment, plants,

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • energy management system means a set of interrelated or interacting elements of a plan which sets an energy efficiency objective and a strategy to achieve that objective;

  • Renewable energy system means a fixture, product, device, or interacting group of fixtures, products, or devices on the customer's side of the meter that use 1 or more renewable energy resources to generate electricity. Renewable energy system includes a biomass stove but does not include an incinerator or digester.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Property management system means the Contractor’s system or systems for managing and controlling Government property.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Safety Management System means a systematic approach to managing safety, including the necessary organizational structures, accountabilities, policies and procedures;

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Renewable Energy Source means an energy source that is not fossil carbon-based, non- renewable or radioactive, and may include solar, wind, biomass, geothermal, landfill gas, or wave, tidal and thermal ocean technologies, and includes a Certified Renewable Energy Source.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • SRS means the scheme referred to by the Ministry of Finance as the Supplementary Retirement Scheme or such other scheme as shall replace or supersede the Supplementary Retirement Scheme from time to time.

  • renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and other such sources as approved by the MNRE;

  • Infrastructure means infrastructure serving the County and improved or unimproved real estate and personal property, including machinery and equipment, used in the operation of the Project, within the meaning of Section 4-29-68 of the Code.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • Production System means a live SAP system used for running Licensee’s internal business operations and where Licensee’s data is recorded.

  • Pest Management Plan and “PMP” means the Recipient’s plan dated December 13, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Database Management System (“DBMS”) is a computer process used to store, sort, manipulate and update the data required to provide Selective Routing and ALI.