Erosion response project definition

Erosion response project means an action intended to address or mitigate coastal erosion, including beach nourishment, sediment management, beneficial use of dredged material, creation or enhancement of a dune, wetland, or marsh, and construction of a breakwater, bulkhead, groin, jetty, or other structure.

Related to Erosion response project

  • Emergency Load Response Program means the program by which Curtailment Service Providers may be compensated by PJM for Demand Resources that will reduce load when dispatched by PJM during emergency conditions, and is described in Operating Agreement, Schedule 1, section 8 and the parallel provisions of Tariff, Attachment K-Appendix, section 8. Energy Efficiency Resource: “Energy Efficiency Resource” shall have the meaning specified in the PJM Reliability Assurance Agreement. Energy Market Opportunity Cost:

  • Improvement completion assurance means a surety bond, letter of credit,

  • Explosives or munitions emergency response specialist means an individual trained in chemical or conventional munitions or explosives handling, transportation, render-safe procedures, or destruction techniques. Explosives or munitions emergency response specialists include Department of Defense (DOD) emergency explosive ordnance disposal (EOD), technical escort unit (TEU), and DOD-certified civilian or contractor personnel; and other Federal, State, or local government, or civilian personnel similarly trained in explosives or munitions emergency responses.

  • Emergency Response Plan means the plan constituting the set of procedures developed by the Owner for dealing with an Incident which may impact on the Network or Connecting Infrastructure, including all actions to be taken to minimise or alleviate any threat or danger to any person or property:

  • Flood-related erosion area management means the operation of an overall program of corrective and preventive measures for reducing flood-related erosion damage, including but not limited to emergency preparedness plans, flood-related erosion control works and floodplain management regulations.

  • improvement notice means the notice issued by the Authority to the Supplier pursuant to Clause 32.1.3 (Authority Remedies) which will detail how the Supplier shall improve the provision of the Goods and/or Services;

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Environmentally critical area means an area or feature which is of significant environmental value, including but not limited to: stream corridors, natural heritage priority sites, habitats of endangered or threatened species, large areas of contiguous open space or upland forest, steep slopes, and well head protection and groundwater recharge areas. Habitats of endangered or threatened species are identified using the Department’s Landscape Project as approved by the Department’s Endangered and Nongame Species Program.

  • Impact Assessment has the meaning given to it in Clause 22.1.3 (Variation Procedure);

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Environmental and Social Impact Assessment or “ESIA” means a site-specific report, to be prepared in accordance with the parameters laid down in the ESMF (as hereinafter defined) and acceptable to the Association, identifying and assessing the potential environmental and social impacts of the activities to be undertaken for the Project, evaluating alternatives, and designing appropriate mitigation, management, and monitoring measures.

  • Impact surface means an interior or exterior surface that is subject to damage by repeated sudden force such as certain parts of door frames.

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Interim Response Costs means all costs, including but not limited to direct and indirect costs, (a) paid by the United States in connection with the Site between [insert date identified in Past Response Costs definition] and the Effective Date, or (b) incurred prior to the Effective Date, but paid after that date.]

  • Remediation waste management site means a facility where an owner or operator is or will be treating, storing or disposing of hazardous remediation wastes. A remediation waste management site is not a facility that is subject to corrective action under § 264.101 of this regulation, but is subject to corrective action requirements if the site is located in such a facility.

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Emergency responder means an individual who is required to possess a license, certificate, permit, or other official recognition for his or her expertise in a particular field or area of knowledge and whose assistance is utilized or is desirable during an emergency. Emergency responder includes, but is not limited to, emergency medical services personnel; physicians; nurses; mental health, veterinary, or other public health practitioners; emergency management personnel; public works personnel; and firefighters, including firefighters trained in the areas of hazardous materials, specialized rescue, extrication, water rescue, or other specialized area. Emergency responder does not include law enforcement officers or other law enforcement personnel.

  • Emergency Response Agency is a governmental entity authorized to respond to requests from the public to meet emergencies.

  • Phase I assessment as described in, and meeting the criteria of, (i) Chapter 5 of the FNMA Multifamily Guide or any successor provisions covering the same subject matter in the case of a Specially Serviced Mortgage Loan as to which the related Mortgaged Property is multifamily property or (ii) the American Society for Testing and Materials in the case of Specially Serviced Mortgage Loan as to which the related Mortgaged Property is not multifamily property.

  • Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Subprojects means more than one such Subproject.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Substance Abuse Professional (SAP) means a qualified person who evaluates employees who have violated a DOT drug and alcohol regulation and makes recommendations concerning education, treatment, follow-up testing, and aftercare.