Environmental resource and geotechnical well driller definition

Environmental resource and geotechnical well driller means a person possessing a New Jersey environmental resource and geotechnical well driller's license pursuant to N.J.A.C. 7:9D-1.7 and 1.8.

Related to Environmental resource and geotechnical well driller

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Environmental Management System means an environmental management system or plan of management to address all environmental risks and to ensure compliance with all Environmental Laws and licences;

  • Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;

  • Environmental Consultant has the meaning set forth in Section 5.17(a).

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Exploration means all activities directed toward ascertaining the existence, location, quantity, quality or commercial value of deposits of Products.

  • Environmentally-Limited Resource means a resource which has a limit on its run hours imposed by a federal, state, or other governmental agency that will significantly limit its availability, on either a temporary or long-term basis. This includes a resource that is limited by a governmental authority to operating only during declared PJM capacity emergencies.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Environmental and Social Management Plan or “ESMP” means a site-specific environmental and social management plan to be prepared in accordance with the parameters laid down in the ESMF and acceptable to the Association, setting forth a set of mitigation, monitoring, and institutional measures to be taken during the implementation and operation of the Project activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels, and including the actions needed to implement these measures.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.