Declared resource definition

Declared resource means an electricity source specifically
Declared resource means an electricity source specifically identified by a retail supplier to serve retail electric customers. A declared resource includes a stated quantity of electricity tied directly to a specified generation facility or set of facilities either through ownership or contract purchase, or a contractual right to a stated quantity of electricity from a specified generation facility or set of facilities.
Declared resource means an electricity source

Examples of Declared resource in a sentence

  • Declared resource portfolio amounts reflecting 5b1A or B generating resources and long term contracts which were declared prior to 2001, would be subject to the same principles as 1, 2 and 3 above.

  • Declared resource portfolio amounts reflecting 5(b)(1)(A) or (B) generating resources and long term contracts that were declared prior to 2001 would be subject to the same principles as 1, 2 and 3 above.

  • Declared resource portfolio amounts reflecting 5b1A or B generating resources and long term contracts which were declared prior to 2001, would be subject to the same principles as items a, b, and c above.

  • Wang Y, Gunasekara DB, Reed MI, DiSalvo M, Bultman SJ, Sims CE, Magness ST, Allbritton NL: A microengineered collagen scaffold for generating a polarized crypt-villus architecture of human small intestinal epithelium.

  • RCW, a cooperative formed under chapter 23.86 RCW, or a mutual1 corporation or association formed under chapter 24.06 RCW, that is2 engaged in the business of distributing electricity to more than one3 retail electric customer in the state.4 (((7))) (6) "Declared resource" means an electricity source5 specifically identified by a retail supplier to serve retail electric6 customers.

  • As used in [sections 1 through 9], unless the context requires3 otherwise, the following definitions apply:4 (1) "Bonneville power administration system mix" means a generation mix sold by the Bonneville power5 administration that is net of any resource-specific sales and that is net of any electricity sold to direct-service6 industrial customers.7 (2) "Declared resource" means an electricity source specifically identified by a retail supplier to serve8 retail electrical energy customers.


More Definitions of Declared resource

Declared resource means an electricity source specifically identified by a retail supplier to serve

Related to Declared resource

  • Landed Resources means when the Contractor or its Sub-contractor causes foreign nationals to be brought to the United Kingdom, to provide the Services.

  • Integrated resource plan means a plan which contains the demand and energy forecast for at least a fifteen‑year period, contains the supplier’s or producer’s program for meeting the requirements shown in its forecast in an economic and reliable manner, including both demand‑side and supply‑side options, with a brief description and summary cost‑benefit analysis, if available, of each option which was considered, including those not selected, sets forth the supplier’s or producer’s assumptions and conclusions with respect to the effect of the plan on the cost and reliability of energy service, and describes the external environmental and economic consequences of the plan to the extent practicable. For electrical utilities subject to the jurisdiction of the South Carolina Public Service Commission, this definition must be interpreted in a manner consistent with the integrated resource planning process adopted by the commission. For electric cooperatives subject to the regulations of the Rural Electrification Administration, this definition must be interpreted in a manner consistent with any integrated resource planning process prescribed by Rural Electrification Administration regulations.

  • Limited Resource Price Decrement means, for the 2017/2018 Delivery Year, a difference between the clearing price for Limited Demand Resources and the clearing price for Extended Summer Demand Resources and Annual Resources, representing the cost to procure additional Extended Summer Demand Resources or Annual Resources out of merit order when the Limited Resource Constraint is binding. List of Approved Contractors:

  • Demand Resource means a resource with the capability to provide a reduction in demand.

  • Environmentally-Limited Resource means a resource which has a limit on its run hours imposed by a federal, state, or other governmental agency that will significantly limit its availability, on either a temporary or long-term basis. This includes a resource that is limited by a governmental authority to operating only during declared PJM capacity emergencies.

  • economic resources means assets of every kind, whether tangible or intangible, movable or immovable, which are not funds, but may be used to obtain funds, goods or services;

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Batch Load Demand Resource means a Demand Resource that has a cyclical production process such that at most times during the process it is consuming energy, but at consistent regular intervals, ordinarily for periods of less than ten minutes, it reduces its consumption of energy for its production processes to minimal or zero megawatts.

  • Advanced Services refers to high speed, switched, broadband, wireline Telecommunications capability that enables users to originate and receive high-quality, voice, data, graphics or video Telecommunications using any technology.

  • Critical Energy Infrastructure Information means all information, whether furnished before or after the mutual execution of this Agreement, whether oral, written or recorded/electronic, and regardless of the manner in which it is furnished, that is marked “CEII” or “Critical Energy Infrastructure Information” or which under all of the circumstances should be treated as such in accordance with the definition of CEII in 18 C.F.R. § 388.13(c)(1). The Receiving Party shall maintain all CEII in a secure place. The Receiving Party shall treat CEII received under this agreement in accordance with its own procedures for protecting CEII and shall not disclose CEII to anyone except its Authorized Representatives.

  • Limited Resource Constraint means, for the 2017/2018 Delivery Year and for FRR Capacity Plans the 2017/2018 and Delivery Years, for the PJM Region or each LDA for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for a Delivery Year, a limit on the total amount of Unforced Capacity that can be committed as Limited Demand Resources for the 2017/2018 Delivery Year in the PJM Region or in such LDA, calculated as the Limited Demand Resource Reliability Target for the PJM Region or such LDA, respectively, minus the Short Term Resource Procurement Target for the PJM Region or such LDA, respectively.

  • Water resources means all waters of the state occurring on the surface, in natural or artificial channels, lakes, reservoirs, or impoundments, and in subsurface aquifers, which are available, or which may be made available to agricultural, industrial, commercial, recreational, public, and domestic users;

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Public resources means water, fish, and wildlife and in addition means capital improvements of the state or its political subdivisions.

  • audit services means the professional services rendered by the Corporation’s external auditor for the audit and review of the Corporation’s financial statements or services that are normally provided by the external auditor in connection with statutory and regulatory filings or engagements;

  • Energy Storage Resource means a resource capable of receiving electric energy from the grid and storing it for later injection to the grid that participates in the PJM Energy, Capacity and/or Ancillary Services markets as a Market Participant. Facilities Study:

  • Day-ahead Scheduling Reserves Resources means synchronized and non-synchronized generation resources and Demand Resources electrically located within the PJM Region that are capable of providing Day-ahead Scheduling Reserves.

  • Baseline data means information gathered at a selected point in time and used thereafter as a basis from which to monitor change.

  • Net energy metering means the difference between the kilowatt-hours consumed by a customer-generator and the kilowatt-hours generated by the customer- generator's facility over any time period determined as if measured by a single meter capable of registering the flow of electricity in two directions.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • System Services has the meaning given such term in Section 3.1.

  • Historic resource means a publicly or privately owned historic building, structure, site, object, feature, or open space located within an historic district designated by the national register of historic places, the state register of historic sites, or a local unit acting under the local historic districts act, 1970 PA 169, MCL 399.201 to 399.215, or that is individually listed on the state register of historic sites or national register of historic places, and includes all of the following:

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • energy service provider means a natural or legal person who delivers energy services or other energy efficiency improvement measures in a final customer’s facility or premises;

  • Nominated Demand Resource Value means the amount of load reduction that a Demand Resource commits to provide either through direct load control, firm service level or guaranteed load drop programs. For existing Demand Resources, the maximum Nominated Demand Resource Value is limited, in accordance with the PJM Manuals, to the value appropriate for the method by which the load reduction would be accomplished, at the time the Base Residual Auction or Incremental Auction is being conducted.

  • Monitoring Services shall have the meaning set forth in Section 2(b) of this Agreement.