Examples of A point of connection in a sentence
A point of connection may, at any given time, be a grid injection point or a grid exit point, but may not be both at the same timegrid interface means the assets used to make a connection to the grid (as the case may be), including associated protection, control and communication systems.
A point of connection with input requirements of less than 1,500 kW at which the input does not take place from a power station which is directly connected is not covered by this exemption.
A point of connection to allow steam/hot water to be taken to a heat recovery system will be required; for example in the case of high efficiency electricity generating steam turbines, suitably designed steam off takes should be installed to provide high quality heat for use in an appropriate heat network/supply.
A point of connection is defined as “a point at which electricity may flow into or out of a network”.
A point of connection to CSR is that CSR is supposed to show a balanced concern between all of these dimensions (Haukaas 2006).Therefore, a corporation which had included CSR strategy into its business strategy will act not only to maximize profit.
A point of connection removed at the request of the owner from an abandoned service location shall be served by the original electric public utility if a new structure is built at this service location.
A point of connection to the Happy Valley Water System will also be provided by this project.
A point of connection can be agreed for foul water disposal to the 600mm dia public sewer to the south of the site.
A point of connection and an electric line removed at the serving electric public utility’s own motion, unless for reasons of safety or liability, shall constitute abandonment and any new or existing structure shall be served at the customer’s choice.
A point of connection for foul flows to the 225mm foul sewer as indicated in the drainage strategy is likely to be acceptable subject to formal application.18/01/18Foul Drainage:o The drainage strategy for disposal of development flows is as anticipated.