Xxxx Water Sample Clauses

Xxxx Water. Contractor shall be responsible for removing and transporting the xxxx water (contact water) from the holding tanks at each Transfer Station, and at the Contractor’s expense, by a licensed hauler. Republic shall be responsible for paying the cost of processing or disposal of the xxxx water at whatever disposal or processing facility to which the xxxx water is delivered. Contractor shall transport the contents of the tanks to either the Santa Xxxx waste water treatment facility or, for the Annapolis Transfer Station, the Gualala waste water treatment facility. When the tanks reach capacity or when notified by Republic, Contractor shall dispatch a licensed hauler immediately to remove the contents of the tank. The hauler shall arrive at the site with an empty tanker. If the hauler knowingly or negligently allows a substance to contaminate the contents of the xxxx water tank, such that the combination of liquids cannot be accepted at the waste water treatment plant, the Contractor shall be responsible for, and bear the cost of, alternative disposal.. If the hauler cannot remove all the contents of the tank in a single load, the hauler will make successive trips until all the contents of the tank have been completely evacuated. In the event emergency conditions prevent the Santa Xxxx or Gualala waste water treatment facilities from accepting the xxxx water, Contractor may transport the grey water to the East Bay MUD facility and charge Republic for its extra costs of transporting such xxxx water up to a maximum of $160 per trip to such facility which maximum amount shall be increased annually by a percentage equal to the Bay Area CPI as that term is defined at Section 7.3 of this Agreement.
AutoNDA by SimpleDocs

Related to Xxxx Water

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Xxxxx, Esq Sher & Xxxxxxxxx LLP; 0000 X Xxxxxx, XX.; Xxxxx 000; Xxxxxxxxxx, XX 00000.

  • FTTP Loop A Loop consisting entirely of fiber optic cable, whether dark or lit, that extends from the main distribution frame (or its equivalent) in an end user’s serving End Office to the demarcation point at the end user’s customer premises or to a serving area interface at which the fiber optic cable connects to copper or coaxial distribution facilities that extend to the end user's customer premises demarcation point, provided that all copper or coaxial distribution facilities extending from such serving area interface are not more than 500 feet from the demarcation point at the respective end users' customer premises; provided, however, that in the case of predominantly residential multiple dwelling units (MDUs), an FTTP Loop is a Loop consisting entirely of fiber optic cable, whether dark or lit, that extends from the main distribution frame (or its equivalent) in the End Office that serves the multiunit premises: (a) to or beyond the multiunit premises’ minimum point of entry (MPOE), as defined in 47 C.F.R. § 68.105; or

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Data Storage Where required by applicable law, Student Data shall be stored within the United States. Upon request of the LEA, Provider will provide a list of the locations where Student Data is stored.

Time is Money Join Law Insider Premium to draft better contracts faster.