Transmission Line Technical Requirements Sample Clauses

Transmission Line Technical Requirements. The line shall meet the following minimum requirements: ▪ Rated operating voltage : 138 kV • Maximum operating voltage : 145 kV • Lighting impulse withstanding voltage : 650 kVpeak • Industrial frequency withstanding voltage (60 Hz) : 275 kV The above values shall be corrected according to the elevation of the facilities. Also, the safety distances in the supports and insulation shall also be corrected by altitude. The length of the creepage distance of the Transmission Line insulation shall be checked in accordance with the level of contamination of the zones it crosses, the maximum voltage level reached and the altitude of these zones. The minimum creepage distances to be considered will be: ▪ In rainforest zones with an altitude of up to 1,000 m.a.s.l.: 20 mm/ kVphase-to-phase.
AutoNDA by SimpleDocs
Transmission Line Technical Requirements. The lines, depending on their voltage level, shall meet the following minimum requirements: L.T.220 kV ▪ Rated operating voltage : 220 kV ▪ Maximum operating voltage : 245 kV ▪ Lighting impulse withstanding voltage : 1050 kVpeak ▪ Industrial frequency withstanding voltage (60 Hz) : 460 kV L.T.60 kV ▪ Rated operating voltage : 60 kV ▪ Maximum operating voltage : 72.50 kV ▪ Lighting impulse withstanding voltage : 325 kVpeak ▪ Industrial frequency withstanding voltage (60 Hz) : 140 kV The above values shall be corrected according to the elevation of the facilities. Also, the safety distances in the supports and insulation shall also be corrected depending on the altitude. The length of the creepage distance of the Transmission Line insulation shall be checked in accordance with the level of contamination of the zones it crosses, the maximum voltage level reached and the altitude of these zones. The minimum creepage distances to be considered will be: ▪ In coast zones with an altitude of up to 1,000 m.a.s.l.: :31 mm/ kVphase-to-phase

Related to Transmission Line Technical Requirements

  • Technical Requirements 2.7.4.1 The NID shall provide an accessible point of interconnection and shall maintain a connection to ground.

  • Minimum Technical Requirements Participant will be responsible for installing (unless Vendor provides), maintaining and hosting the Vendor’s integration package (either “Full Express” or “Express Lite” software) on Participant’s own computer to enable connectivity to the Network for the Patient Look-Up and Delivery Services including installing and maintaining updates and upgrades. Participant’s machine must meet the following requirements for hosting the Vendor’s integration package: • A virtual machine environment running VMware Player (free open source product) that can run the Express VMware disk image (.ova format) • For Vendor’s “Express Lite” software (for Participants that already have an enterprise master patient index (MPI) and a clinical data repository), the minimum system resources that should be allocated to the virtual machine are: o 4 CPU cores o 8GB of RAM o 100GB of available disk space • For Vendor’s “Full Express” software (for Participants that do not already have an MPI or a clinical data repository), the minimum system resources that should be allocated to the virtual machine are: o 8 CPU cores o 16GB of RAM o 500GB of available disk space • Network access between the Vendor’s Express software (either “Express Lite” or “Full Express”) and the Participant’s health information exchange system for the exchange of clinical system data for the Patient Look-Up and Delivery Services. The Participant shall maintain availability of its data for query on a 24 hour/7 day basis with the exception of routine and unexpected maintenance, at greater than 99% uptime monthly. The Participant shall make its data available for a minimum look-back period of 18 months up to and including current available data and update the available data daily.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Technical Requirements for SCPs/Databases 10.5.3.1 BellSouth shall provide physical access to SCPs through the SS7 network and protocols with TCAP as the application layer protocol.

  • Nyiso and Connecting Transmission Owner Authority General.‌‌ NYISO or Connecting Transmission Owner may take whatever actions with regard to the New York State Transmission System or the Connecting Transmission Owner’s Attachment Facilities it deems necessary during an Emergency State in order to (i) preserve public health and safety, (ii) preserve the reliability of the New York State Transmission System or the Connecting Transmission Owner’s Attachment Facilities, (iii) limit or prevent damage, and (iv) expedite restoration of service. NYISO and Connecting Transmission Owner shall use Reasonable Efforts to minimize the effect of such actions or inactions on the Large Generating Facility or the Developer’s Attachment Facilities. NYISO or Connecting Transmission Owner may, on the basis of technical considerations, require the Large Generating Facility to mitigate an Emergency State by taking actions necessary and limited in scope to remedy the Emergency State, including, but not limited to, directing Developer to shut-down, start-up, increase or decrease the real or reactive power output of the Large Generating Facility; implementing a reduction or disconnection pursuant to Article 13.4.2; directing the Developer to assist with blackstart (if available) or restoration efforts; or altering the outage schedules of the Large Generating Facility and the Developer’s Attachment Facilities. Developer shall comply with all of the NYISO and Connecting Transmission Owner’s operating instructions concerning Large Generating Facility real power and reactive power output within the manufacturer’s design limitations of the Large Generating Facility’s equipment that is in service and physically available for operation at the time, in compliance with Applicable Laws and Regulations.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Technical and Interconnection Requirements 2.1 Consumer agrees that his Rooftop Solar PV System and Net Metering System will conform to the standards and requirements specified in the Policy, Regulations and Supply Code as amended from time to time.

  • Closet/Urinal Requirements 6.1 Employees Closets Urinals 1-5 1 Nil 6-10 1 1 11-20 2 2 21-35 3 4 36-50 4 6 51-75 5 7 76-100 6 8

  • Equipment and Software Requirements In order to view and retain electronic communications that we make available to you, you must have: • A PC or other device with an Internet browser that has “cookies” enabled and supports 128 bit encryption • An Internet connection • An email address • A PDF viewer (such as Adobe Reader) • A printer or computer with sufficient electronic storage space All communications shall be delivered to the last address we have on file for you. These notices will be sent through electronic delivery (email) and will be considered delivered the same day as sent. If you have opted out of electronic delivery, communications sent to you through the United States Postal Service are considered delivered 5 business days after the postmark date. It is your responsibility to notify the Custodian of any email address change or residential address change. We will not be held liable for any losses or damages if you have not provided Custodian with the most current address information. The electronically signed copy of this document should be considered equivalent to a printed hard copy form. It is considered a true and complete record of the document, admissible in arbitration and/or administrative hearings or proceedings. Your electronic signature on the Application and other electronic forms such as the Investment Direction are considered valid and the same as if the paper form or Application were signed.

  • Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner [shall/shall not] transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.