TRANSMISSION LINE MILES Sample Clauses

TRANSMISSION LINE MILES. Based on the number of miles of transmission lines, weighted for design voltage (Voltage < 400kv = 1; Voltage >=400kv =2). Used primarily for the allocation of costs associated with project design, maintenance and installation of Entergy transmission lines. TSL - COMPOSITE - TRANSMISSION LINES/SUBSTATIONS Based on two components: Transmission Line Miles (30% weighting) and the Number of High Voltage Substations (70% weighting). Used primarily for the allocation of the costs associated with the support of the transmission and distribution function that has both a transmission line component as well as a substation or load component.
AutoNDA by SimpleDocs
TRANSMISSION LINE MILES. Based on the number of miles of transmission lines, weighted for design voltage (Voltage < 400kv = 1; Voltage >=400kv =2). Used primarily for the allocation of costs associated with project design, maintenance and installation of Entergy transmission lines.
TRANSMISSION LINE MILES. Based on the number of miles of transmission lines, weighted for design voltage (Voltage ~ 400kv = 1; Voltage >=400kv =2). Used primarily for the allocation of costs associated with project design, maintenance and installation of Entergy transmission lines. Based on the number of high voltage substations weighted for Voltage (Voltage < 500kv = 1; Voltage >= 500kv = 2). Used primarily for the allocation of related engineering and technical support for transmission and distribution substation operations and maintenance as well as for engineering and project management associated with substation construction. COMPOSITE - TRANSMISSION LINES/SUBSTATIONS Based on two components: Transmission Line Miles (30% weighting) and the Number of High Voltage Substations (70% weighting). Used primarily for the allocation of the costs associated with the support of the transmission and distribution function that have both a transmission line component as well as a substation or load component.

Related to TRANSMISSION LINE MILES

  • Fax Transmission A facsimile, telecopy or other reproduction of this Amendment may be executed by one or more parties hereto, and an executed copy of this Amendment may be delivered by one or more parties hereto by facsimile or similar instantaneous electronic transmission device pursuant to which the signature of or on behalf of such party can be seen, and such execution and delivery shall be considered valid, binding and effective for all purposes. At the request of any party hereto, all parties hereto agree to execute an original of this Amendment as well as any facsimile, telecopy or other reproduction hereof.

  • Transmission The Custodian and the Fund shall comply with SWIFT’s authentication procedures. The Custodian will act on FT Instructions received via SWIFT provided the instruction is authenticated by the SWIFT system. § Written Instructions. Instructions may be transmitted in an original writing that bears the manual signature of an Authorized Person(s).

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

  • Computer Transmission The Custodian is able to accept transmissions sent from the Fund’s computer facilities to the Custodian’s computer facilities. If the Fund determines to use its proprietary transmission or other electronic transmission method, it must provide Custodian sufficient notice and information to allow testing or other confirmation that FT Instructions received via the Fund Designated Security Procedure can be processed in good time and order. The Custodian may require the Fund to execute additional documentation prior to the use of such transmission method.

  • Rooftop Equipment Provided that Tenant complies with the terms of ----------------- this Section, Tenant may, at its risk and expense, install a satellite dish and related communications equipment and wiring (collectively, the "Rooftop ------- Equipment") on the roof of the Building at a location approved by Landlord, --------- which equipment may be used solely by Tenant and its Permitted Transferees or Permitted Sublessees. Before installing the Rooftop Equipment, Tenant shall submit to Landlord for its approval (which approval shall be in Landlord's sole discretion) plans and specifications which (a) specify in detail the design, location, size, and, in the case of a satellite dish, frequency of the Rooftop Equipment and (b) are sufficiently detailed to allow for the installation of the Rooftop Equipment in a good and workmanlike manner and in accordance with all Laws (the "Legal Requirements"). If Landlord approves of such plans, Tenant ------------------ shall install (in a good and workmanlike manner), maintain and use the Rooftop Equipment in accordance with all Legal Requirements and shall obtain all consents and permits required for the installation and operation thereof; copies of all such permits and evidence of such consents must be submitted to Landlord before Tenant begins to install the Rooftop Equipment. Tenant shall thereafter maintain all permits necessary for the maintenance and operation of the Rooftop Equipment while it is on the Building and operate and maintain the Rooftop Equipment in such a manner so as not to unreasonably interfere with any other satellite, antennae, or other transmission facility on the Building's roof or in the Building. Landlord may require that Tenant screen the Rooftop Equipment with a parapet or other screening device acceptable to Landlord. Tenant shall maintain the Rooftop Equipment and screening device in good repair and condition. Tenant shall, at its risk and expense, remove the Rooftop Equipment (including all wiring related thereto), within five days after the occurrence of any of the following events: (1) the termination of Tenant's right to possess the Premises; (2) the termination of the Lease; (3) the expiration of the Term; or (4)

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Facsimile Transmission A FT Instruction transmitted to the Custodian by facsimile transmission must be transmitted by the Fund to a telephone number specified from time to time by the Custodian for such purposes. The Custodian will then follow one of the procedures below:

  • Network Access Control The VISION Web Site and the Distribution Support Services Web Site (the “DST Web Sites”) are protected through multiple levels of network controls. The first defense is a border router which exists at the boundary between the DST Web Sites and the Internet Service Provider. The border router provides basic protections including anti-spoofing controls. Next is a highly available pair of stateful firewalls that allow only HTTPS traffic destined to the DST Web Sites. The third network control is a highly available pair of load balancers that terminate the HTTPS connections and then forward the traffic on to one of several available web servers. In addition, a second highly available pair of stateful firewalls enforce network controls between the web servers and any back-end application servers. No Internet traffic is allowed directly to the back-end application servers. The DST Web Sites equipment is located and administered at DST’s Winchester data center. Changes to the systems residing on this computer are submitted through the DST change control process. All services and functions within the DST Web Sites are deactivated with the exception of services and functions which support the transfer of files. All ports on the DST Web Sites are disabled, except those ports required to transfer files. All “listeners,” other than listeners required for inbound connections from the load balancers, are deactivated. Directory structures are “hidden” from the user. Services which provide directory information are also deactivated.

  • Speed (a) The Contract Price shall not be affected or changed by reason of the trial speed (as determined according to the SPECIFICATIONS being less than the guaranteed speed, if such variation is not more than Two-Tenths (2/10) of One (1) knot.

  • Substantial Completion The Tenant Improvements shall be deemed to be “Substantially Completed” on the date that (i) the Tenant Improvements are essentially and satisfactorily completed in accordance with the Final Plans to the extent that the Leased Premises may be occupied by Tenant for its Approved Use, subject only to completion of minor finishing, adjustment of equipment, and other minor construction aspects (“punch list items”) which do not, in the aggregate, cause interference (other than minor inconvenience) with the use and occupancy of the Leased Premises for the Approved Use, and (ii) a certificate of occupancy, whether conditional or final, has been issued by the proper governmental authority. Landlord shall give Tenant at least 30 days prior notice (written or oral) of Landlord’s reasonable estimate of the date of Substantial Completion of the Tenant Improvements. Tenant shall schedule with Landlord a mutually acceptable date, which will not be later than 3 business days after the date of Substantial Completion (but in no event earlier than the Landlord’s estimated date of Substantial Completion), for a walk-through inspection of the Leased Premises. In such walk-through, Landlord and Tenant will mutually and reasonably agree upon a punch list, and subject to Tenant Delay, Landlord will use reasonable efforts to cause such punch list work to be completed within 30 days after such walk-through. Landlord hereby warrants to Tenant, which warranty shall survive for one year following the date of Substantial Completion of the Tenant Improvements, that (a) the materials and equipment furnished by Landlord and Landlord’s contractors in the completion of the Tenant Improvements will be of good quality and new, and (b) such materials and equipment and the work of such contractors shall be free from defects not inherent in the quality required or permitted hereunder. This warranty shall exclude damages or defects caused by Tenant, its agents, employees or contractors, improper or insufficient maintenance, improper operation or normal wear and tear under normal usage. Landlord shall use diligent and good faith efforts to cause the Tenant Improvements for the Fifth Floor Premises to be Substantially Completed by November 1, 2018. Subject only to Force Majeure (as defined in §11 hereof) and Tenant Delay, and provided that Landlord, using good faith efforts, obtains all required construction permits for the Tenant Improvements (the “Construction Permits”) by not later than June 30, 2018, then in the event that Landlord fails to cause the Tenant Improvements for the Fifth Floor Premises to be Substantially Completed on or before December 1, 2018, (the “Fifth Floor Substantial Completion Date”), Tenant shall be entitled to a day-for-day credit of Base Rent due as of the Commencement Date, for each day after the Fifth Floor Substantial Completion Date that the Tenant Improvements for the Fifth Floor Premises are not Substantially Completed; provided, however, that, for every day of delay which results from a Tenant Delay or a Force Majeure, the Fifth Floor Substantial Completion Date shall be moved back on a day-for-day basis. Such day-for-day credit of Base Rent shall commence upon the Commencement Date and shall continue until applied in full; provided that at no time may Tenant offset more than 50% of the Base Rent amount due each month until such abatement has been completed. Landlord shall use diligent and good faith efforts to cause the Tenant Improvements for the Fourth Floor Premises to be Substantially Completed by February 1, 2019. Subject only to Force Majeure (as defined in §11 hereof) and Tenant Delay, and provided that Landlord, using good faith efforts, obtains all required construction permits for the Tenant Improvements (the “Construction Permits”) by not later than June 30, 2018, then in the event that Landlord fails to cause the Tenant Improvements for the Fourth Floor Premises to be Substantially Completed on or before March 1, 2019, (the “Fourth Floor Substantial Completion Date”), Tenant shall be entitled to a day-for-day credit of Base Rent due as of the Commencement Date, for each day after the Fourth Floor Substantial Completion Date that the Tenant Improvements for the Fourth Floor Premises are not Substantially Completed; provided, however, that, for every day of delay which results from a Tenant Delay or a Force Majeure, the Fourth Floor Substantial Completion Date shall be moved back on a day-for-day basis. Such day-for-day credit of Base Rent shall commence upon the June 1, 2019, and shall continue until applied in full; provided that at no time may Tenant offset more than 50% of the Base Rent amount due each month until such abatement has been completed. Subject only to Force Majeure and Tenant Delay, and provided that Landlord, using good faith efforts, obtains all required Construction Permits by not later than June 30, 2018, if the Tenant Improvements for the Leased Premises are not Substantially Completed on or before April 1, 2019 (“Outside Completion Date”), then Tenant shall have the one-time right by not later than 10 days after the Outside Completion Date to terminate this lease by delivering written notice to Landlord, which notice shall be hand delivered to 0000 Xxxx Xxxxx Xxxxx, Xxxxxxxx, Xxxx 00000, Attention: Xxxxxx X. Xxxxx, Xx., and upon hand delivery of such termination notice to said address, this lease shall be deemed null and void and the parties shall have no further rights or obligations hereunder, except those that specifically survive the expiration or earlier termination of this lease. Landlord and Tenant acknowledge and agree that Tenant’s damages as a result of Landlord’s failure to cause the Tenant Improvements for the Fifth Floor Premises to be Substantially Completed by not later than the Fifth Floor Substantial Completion Date or the Fourth Floor Premises to be Substantially Completed by not later than the Fourth Floor Substantial Completion Date are difficult to ascertain, that such amounts set forth above are a reasonable pre-estimate of Tenant’s probable loss as a result thereof and that such damages constitute reasonable liquidated damages for Tenant’s loss and not a penalty.

Time is Money Join Law Insider Premium to draft better contracts faster.