STORMWATER MANAGEMENT PERMIT Sample Clauses

STORMWATER MANAGEMENT PERMIT. 1. The Contractor is responsible for securing and paying for the State Stormwater Management Permit and/or local Stormwater Management Permit as may be required.
AutoNDA by SimpleDocs
STORMWATER MANAGEMENT PERMIT. (SMP) – A permit issued by the Upton Conservation Commission after review of an application, plans, calculations, and other supporting documents, which is designed to protect the environment of the Town from the deleterious affects of uncontrolled and untreated stormwater runoff during development. SWALE— A natural depression or wide, shallow ditch used to temporarily store, route, or filter runoff. TOTAL CUMULATIVE DISTURBED AREA – The total land area (square feet) affected by any action (land clearing, grading, bulldozing, digging or similar activity) that causes a change in the position, location, or arrangement of soil, sand, rock, gravel or similar earth material. WATERCOURSE — Any body of water, including, but not limited to, lakes, ponds, rivers, streams, and bodies of water. WATERWAY — A channel that directs surface runoff to a watercourse or to the public storm drain. Wetlands – Resource areas as defined in the Wetlands Protection Act, X.X. x. 131, § 40, and its Regulations, 310 CMR 10.00 et seq., and the Upton Wetland Bylaw. WAIVER — An intentional relinquishment of some right, interest, or the like. An express or written statement of such relinquishment.
STORMWATER MANAGEMENT PERMIT. The following schedule of fees is established for the filing and review of Developer’s stormwater management permit application and the inspection of construction or maintenance activities related to required stormwater improvements:

Related to STORMWATER MANAGEMENT PERMIT

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • FLOODPLAIN MANAGEMENT AND WETLAND PROTECTION Executive Order 11988, Floodplain Management, May 24, 1977 (42 FR 26951), 3 C.F.R., 1977 Comp., p. 117, as interpreted in HUD regulations at 24 C.F.R. Part 55, particularly Section 2(a) of the Order (For an explanation of the relationship between the decision- making process in 24 C.F.R. Part 55 and this part, see § 55.10.); and Executive Order 11990, Protection of Wetlands, May 24, 1977 (42 FR 26961), 3 C.F.R., 1977 Comp., p. 121 particularly Sections 2 and 5. COASTAL ZONE MANAGEMENT The Coastal Zone Management Act of 1972 (16 U.S.C. § 1451, et seq.), as amended, particularly sections 307(c) and (d) (16 U.S.C. § 1456(c) and (d)).

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • SITE MANAGEMENT We reserve the right, but not the obligation, to: (1) monitor the Site for violations of these Terms of Use; (2) take appropriate legal action against anyone who, in our sole discretion, violates the law or these Terms of Use, including without limitation, reporting such user to law enforcement authorities; (3) in our sole discretion and without limitation, refuse, restrict access to, limit the availability of, or disable (to the extent technologically feasible) any of your Contributions or any portion thereof; (4) in our sole discretion and without limitation, notice, or liability, to remove from the Site or otherwise disable all files and content that are excessive in size or are in any way burdensome to our systems; and (5) otherwise manage the Site in a manner designed to protect our rights and property and to facilitate the proper functioning of the Site.

  • Environmental Management (a) The Operator must, prior to the commencement of any Train Services (including any new or varied Train Services):

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Environmental Pollution Unless disposition of environmental pollution is specifically a part of this contract, PURCHASER shall immediately notify STATE of any hazardous substance(s) which PURCHASER discovers or encounters during performance of the operation. "Hazardous substance(s)" are those substances, materials, or wastes regulated by state or federal law. PURCHASER shall immediately cease operating in any particular area of the operations where a hazardous substance(s) has been discovered or encountered, if continued operations in such area would present a bona fide risk or danger to the health or well being of PURCHASER's or any subcontractor's work force. Upon being notified by PURCHASER of the presence of hazardous substance(s) on the areas of operations, STATE shall arrange for the proper disposition of such hazardous substance(s).

  • MANAGEMENT GRIEVANCES 8.01 It is understood that the Management may at any time file a grievance with the staff representative of the Union and request a meeting with him to discuss any complaint with respect to the conduct of the Union, its officers or committee member, in its relationships with the Company or other employees or with respect to any complaint that there has been a violation of any contractual obligation undertaken by the Union, and that if such grievance by the Management is not settled to the mutual satisfaction of the conferring parties it may be referred to arbitration as set forth in Article VII above.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

Time is Money Join Law Insider Premium to draft better contracts faster.