Common use of Statement of Probable Construction Cost Clause in Contracts

Statement of Probable Construction Cost. I certify that I have examined the Predesign Study (or Program) as furnished to me by the Using Agency for this Project. I certify to the best of my knowledge, information, and belief that the Probable Construction Cost furnished herein covers all work to be drawn, specified, and constructed under the Predesign Study (or Program.) I certify to the best of my knowledge, information, and belief that, as to the Statement of Probable Construction Cost furnished herein, all construction work necessary for the completion of the Project for occupancy is included. I certify to the best of my knowledge, information, and belief that there is no work included in this Statement of Probable Construction Cost furnished herein that is beyond the scope of this Project as defined by the Predesign Study (or Program) referred to in Paragraph 1 of this certificate. I certify to the best of my knowledge, information, and belief that: The total sum area in square feet of this Project, computed in accordance with the criteria in Exhibit F of the Design Professional Contract, per the attached computations, is ; The total cubage of this Project, per attached computations, is ; The estimated cost per square foot based on the anticipated low Bid (or anticipated initial GMP Change Order) for a turnkey job is, $ ; The estimated cost per cubic foot based on the anticipated low Bid (or anticipated initial GMP Change Order) for a turnkey job, is $ ; The separate estimated cost of grading site, per attached detailed breakdown or engineering figure, in compliance with the Site Memorandum, is $ ; and The time required for completion of construction is estimated to be calendar days from the date of commencement of work. Subsurface Investigations. The Design Professional certifies he has a report on file from a competent geotechnical engineer or competent independent testing laboratory, the said report being signed by a registered geotechnical engineer, in which the Design Professional has been furnished with both the Stage One and the Stage Two Statements as prescribed in the Site Memorandum (see Exhibit G), according to which the Design Professional advises the Owner that the following quantity of rock will probably be encountered: . The Design Professional estimates that the cost of removing the above quantity of rock will be approximately $ . The Design Professional further advises that this amount has been included in the Statement of Probable Construction Cost and that the Design Professional, if applicable, has included unit prices for removal in the Supplementary General Conditions to the Construction Contract. Accordingly, the Design Professional notifies the Owner of the following conditions below the surface of the ground that are at variance to the conditions indicated by the drawings and specifications or that may subsequently require adjustments in the Contract sum: Investigations as reported by registered geotechnical engineer indicate the existence of springs or ground water. (YES) (NO) Investigations as reported by registered geotechnical engineer indicate the existence of unsatisfactory soil conditions for foundations. (YES) (NO) Investigations as reported by registered geotechnical engineer indicate the existence of a filled area. (YES) (NO) Investigations as reported by registered geotechnical engineer indicate the necessity of installing caissons. (YES) (NO) Investigations as reported by registered geotechnical engineer indicate the necessity of obtaining additional fill materials. (YES) (NO) Investigations as reported by registered geotechnical engineer indicate the necessity of requiring piles or other deep foundations. (YES) (NO) Investigations as reported by registered geotechnical engineer indicate the existence of other conditions on a separate sheet. (YES) (NO) I certify to the best of my knowledge, information, and belief that the Probable Construction Cost is current with the date of execution entered hereinbelow. Witness my hand this day of , 20 . Design Professional EXHIBIT K Georgia Security and Immigration Compliance Act Affidavits

Appears in 6 contracts

Samples: www.usg.edu, www.usg.edu, www.usg.edu

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.