Staging and centering Sample Clauses

Staging and centering. The contractor shall submit detailed plans for staging and centering for examination by the Superintending Engineer. If such plans are not satisfactory to the Superintending Engineer, the contractor shall make such changes in them as may be required, but it is understood that the Superintending Engineer concurrence in the use of the plans as submitted or corrected shall in no way relieve the contractor of responsibility of obtaining satisfactory results. For calculating the strength of staging or centering, a weight of 2400kg/m3 (150 Ibs./c.f.t.)shall be assumed for green concrete. The contractor shall make allowance for the deflection of forms and for shrinkage and settlement of staging or centering in addition to the allowance of dead loads, deflection and camber, as shown upon the plans. The Superintending Engineer may require the contractor to use screw jacks hard wood wedges to take up any settlement in staging or centering either before or during the placing of concrete. All staging and false work shall be bujld on foundations of sufficient strength to carry the load without the appreciable deformation on stable soils like stiff clay and sand spread footings are used and shall be of size to be determined by the load to be supported. In. other location, the false work shall be supported on piles. The piles shall be spaced and driven to support the required loads without settlement. Staging and cenering will be considered as a part of the work and no extra compensation will be allowed..
AutoNDA by SimpleDocs

Related to Staging and centering

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • Training and Orientation (a) No employee shall be required to work on any job or operate any piece of equipment until he/she has received proper training and instruction.

  • SUBLOOPS 45.1. Sprint will offer unbundled access to copper subloops and subloops for access to multiunit premises wiring. Sprint will consider all requests for access to subloops through the ICB process due to the wide variety of interconnections available and the lack of standards. A written response will be provided to CLEC covering the interconnection time intervals, prices and other information based on the ICB process as set forth in this Agreement.

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

Time is Money Join Law Insider Premium to draft better contracts faster.