Source and Quality of Materials and Workmanship Sample Clauses

Source and Quality of Materials and Workmanship. All electric hardware, equipment and systems installed by the Contractor on the electric power distribution system shall be applicable to the electric power specifications for Site 1, Site 2 and Site 3. The electric power distribution system operates at 60 Hertz and utilizes a 15 kV primary voltage specification with secondary voltages to match levels rated for U.S. residential class systems.
AutoNDA by SimpleDocs

Related to Source and Quality of Materials and Workmanship

  • Quality of Materials and Workmanship Unless otherwise specified, all materials shall be new, and both workmanship and materials shall be of good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials and work. The burden of proof is on the Contractor.

  • MATERIALS AND WORKMANSHIP Unless otherwise specified, all materials and equipment incorporated in the work under the Contract shall be new. All workmanship shall be first class and by persons qualified in the respective trades.

  • Responsibility for Quality of Materials and Installation Contractor acknowledges that he has full, total, and complete responsibility for providing materials, labor, and all other items necessary for providing the level of quality specified in the Contract Documents. He agrees that this responsibility is indivisible, non-delegable, non- transferable, and not diminished by any inspections provided by the Design Professional or his consulting engineers, nor by any inspections provided by the Owner. In recognition of this, Contractor will prepare for submission and review by the Design Professional, a written program describing the efforts that will be taken to insure the proper quality level is achieved. The program shall be submitted prior to the issuance of a Proceed Order.

  • Workmanship and Quality 7.8.1 Employees appropriately qualified will sign all required documentation in accordance with the applicable statutes and regulations.

  • Services, Materials, and Equipment Unless otherwise specified, the Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities, incidentals, and services necessary for the construction, performance, testing, start-up, inspection and completion of the Work.

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.

  • Use of Materials There should be no limitations or restrictions by Union upon a Contractor's choice of materials or design, nor, regardless of source or location, upon the full use and utilization, of equipment, machinery, packaging, precast, prefabricated, prefinished, or preassembled materials, tools or other labor saving devices, subject to the application of the California Public Contract and Labor Codes. Generally, the onsite installation or application of such items shall be performed by the craft having jurisdiction over such work.

  • Packaging Materials and Containers for Retail Sale Packaging materials and containers in which a good is packaged for retail sale shall, if classified with the good, be disregarded in determining whether all the non-originating materials used in the production of the good undergo the applicable change in tariff classification set out in Annex 4, and, if the good is subject to a regional value-content requirement, the value of such packaging materials and containers shall be taken into account as originating or non-originating materials, as the case may be, in calculating the regional value content of the good.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

Time is Money Join Law Insider Premium to draft better contracts faster.