Snow Piling Sample Clauses

Snow Piling. I. Contractor shall be cognizant of the drainage pattern of Facility paved surfaces and shall not pile snow over drains.
AutoNDA by SimpleDocs
Snow Piling. Snow must be pushed and piled on Kwik Trip property only, unless formal written agreement has been issued. 4.
Snow Piling. The piling of snow should reduce the number of available parking spaces by no more than 15-20% of the total number of parking spaces on the premises. Vendor shall immediately notify the store leader when more than 15-20% of the parking spaces will be Rev 5/2019 Vendor Initials affected by the piling of snow. Snow must be pushed and piled on Kwik Trip property only, unless formal written agreement has been issued.

Related to Snow Piling

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Pruning Nondestructive thinning of lateral branches to enhance views or trimming, shaping, thinning or pruning of a tree necessary to its health and growth is allowed, consistent with the following standards:

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Filtering Company may employ various filtering methods to reduce unwanted content, such as SPAM e-mail, from reaching Your Company Account. You acknowledge and agree that such methods may prevent legitimate content from reaching Your Account and that Company will not be liable therefor.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Caching The Participating Institutions and the Authorized Users are authorized in the course of an automatic process of an internet browser or any other software to make temporary local digital copies of the Licensed Materials in order to ensure proper operation and use of such internet browser or for proper functioning of such software. For the avoidance of doubt, the cached copy is not a derivative work.

  • Mowing Mowing, edging (of sidewalks, paved approaches and curbs), litter removal, herbicide treatment, grass clipping removal, and brush control are included under one bid item. Regular mowing under this contract is generally limited to mowing areas of shoulders, front and back slopes of ditches less than or equal to three-to-one (3:1) slope, roadside retention areas, dry roadside ditch bottoms, median islands and various width utility strips and similar areas. Slope mowing, which is also a contract requirement, is generally limited to slopes greater or steeper than three-to-one (3:1) and are relatively inaccessible to the use of conventional mowing equipment (e.g., steep slopes, retention area banks and shores, bridge/overpass banks, canal banks, wet roadside ditches, etc). These types of areas will normally require equipment specifically designed for this type of work. When slope mowing is performed, it will incorporate the use of string trimmers to protect the integrity of the slope and prevent damage to the turf. Sign posts, mailboxes, guardrails, trees, roadside outfall structures, fences, divider walls, shrubs, plants, light poles, utility flags or other such obstacles to mowing will be hand mowed or trimmed around as necessary to present a groomed appearance. Top of vegetation on wet bottom ditches areas must be cut-off to the water’s level. Particular attention will be paid to planted areas. Any damage that occurs to plants, trees, shrubs, mulched beds, tree rings, sprinkler heads, etc., will be repaired or restored, at the Contractor’s expense, before the cycle is completed. Mowing will also include grass clipping removal and litter removal, edging, and herbicide treatment. These costs will be included in the unit price bid for right-of-way mowing.

  • Litter In accordance with the Virginia Anti-Litter Law, receptacles sufficient to contain workmen's litter and construction wastes capable of being spread by wind or water shall be located on the construction site. The number and size of receptacles required shall be determined by the Contractor.

  • Load Shedding The Distributor may carry out Load Shedding in the following circumstances:

Time is Money Join Law Insider Premium to draft better contracts faster.