Sentinel 1 Temporal Parameters Sample Clauses

Sentinel 1 Temporal Parameters. Based on the Sentinel-1 data, several temporal parameters are computed for the period 1.1.2019- 31.12.2019 on a global scale. These serve as an input for the flood algorithms, exclusion layers and advisory flags. The parameters differ in their temporal aggregation. Parameter computed on monthly basis are in the following called GRMAG for grouped monthly aggregated, parameters aggregated over the total time period TAG. Moreover, parameters are either computed over all orbits together or per orbit. The temporal parameters are listed and described in Table 3. Table 3: Overview of Sentinel-1 temporal parameters, and availability per orbit and over all orbits. PARAMETER DESCRIPTION PER ORBIT OVER ALL ORBITS Number of observations (NOBS) Contains the number of observations per pixels. This parameter is available per orbit and for all orbits combined. x x Low backscatter frequency (LTM15-FREQ) Contains the frequency of observations below -15dB. This parameter is calculated per orbit and serves as an input for the low backscatter masking. x Mean (TAG-MEAN) The total aggregated mean backscatter. The parameter is calculated per orbit and as a weighted average over all orbits. The latter is used as an input for the DLR and LIST algorithms to extract the permanent water mask and will in a later version be replaced by the median over the entire time series. x x 5th percentile (PERC-05) The 5th percentile is calculated per orbit and used as an input for the advisory flags. x Monthly grouped median (GRMAG- MEDIAN) The GRMAG-MEDIAN is calculated for all month over the two years over all orbits. It is used as an input for the DLR and LIST algorithms to extract the seasonal water mask. x
AutoNDA by SimpleDocs
Sentinel 1 Temporal Parameters 

Related to Sentinel 1 Temporal Parameters

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Health plan specification The Employer will require health plans participating in the Group Insurance Program to develop and implement health promotion and health education programs for State employees and their dependents.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • CLOUD SPECIFIC TERMS AND CONDITIONS To the extent that Contractor has received an award for Lot 3, Cloud, the following terms and conditions apply to Lot 3, Cloud. For the duration of an Authorized User Agreement, the Cloud Solution shall conform to the Cloud Solution Manufacturer’s specifications, Documentation, performance standards (including applicable license duration, warranties, guarantees, Service Level Agreements, service commitments, and credits). PROTECTION OF DATA, INFRASTRUCTURE AND SOFTWARE Contractor is responsible for providing physical and logical security for all Data, infrastructure (e.g. hardware, networking components, physical devices), and software related to the services the Contractor is providing under the Authorized User Agreement. All Data security provisions agreed to by the Authorized User and Contractor within the Authorized User Agreement may not be diminished for the duration of the Authorized User Agreement without prior written agreement by the parties amending the Authorized User Agreement.

  • Technical Specifications 1. A procuring entity shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with the purpose or effect of creating an unnecessary obstacle to trade between the Parties.

  • Parameters In calculating the MtM Exposure for each Transaction, the following parameters are set on the Transaction Date: ▪ On-Peak Initial Xxxx Xxxxx ▪ Off-Peak/On-Peak Price Ratio ▪ Off-Peak Initial Xxxx Xxxxx ▪ MW-Measure: initial Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Off-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Number of awarded Tranches In calculating the MtM Exposure for each Transaction, the following parameters are set each Trading Day subsequent to the Transaction Date: ▪ On-Peak Forward Price ▪ Off-Peak Forward Price ▪ Current Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity ▪ Off-Peak Estimated Energy Quantity Process to Update the On-Peak Initial Mark Prices and Off-Peak Initial Mark Prices on a Daily Basis On each Trading Day subsequent to the Transaction Date, the Pricing Agent will contact four Reference Market-Makers to obtain price quotes for on-peak and off-peak energy for PJM Western Hub. The Pricing Agent may not rely upon quotes from Seller or any Affiliate of Seller. The updated mark for a month will be equal to the average mark for that month over all sources from which a quote is available. If a monthly quote is available from any source, only the monthly quote or monthly quotes shall be used. Where quotes provide a bid and ask, the average shall be used. Where a quote for an individual month is unavailable, but the month is quoted as part of a “packaged” quote (e.g., January 2011 is only available in the form of a January/February 2011 “packaged” quote or an annual quote): ▪ If the other month/months of the package quote is/are also unavailable, then the marks for all months of the package will be calculated by multiplying the packaged quote by the ratio of the corresponding month to the corresponding calculated package quote from the previous day. Example: There are no On-Peak quotes available on day X during the contract for July 2011 or August 2011. However, there is an On-Peak July/August 2011 packaged quote of $73.00/MWh available. The On-Peak marks from day X-1 for July 2011 and August 2011 were $73.50/MWh and $76.50/MWh respectively. The day X On-Peak mark for July 2011 is set at 73.00 * [73.50] / [( (73.50 * 352) + (76.50 * 336) ) / (352+336) ] = 73 * (73.50/ 74.97) = $71.57/MWh. The day X On-Peak mark for August 2011 is set at 73.00 * [76.50] / [( (73.50 * 352) + (76.50*336) ) / (352+336) ] = 73 * (76.50 / 74.97) = $74.49/MWh. ▪ If the other month/months of the package quote is/are available, then the mark for the month will be set such that the average of the month and the other month(s) (weighted for either the On-Peak Hours or Off-Peak Hours as applicable) equals the packaged quote (see calculation example below).

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

Time is Money Join Law Insider Premium to draft better contracts faster.