SDWRF Dewatering Capacity Improvements Sample Clauses

SDWRF Dewatering Capacity Improvements. The SDWRF solids handling building includes three belt filter presses, one of which has not provided reliable service. Develop a detailed design for replacement of this equipment with a new belt filter press similar in size and function to the existing equipment and fitting into the existing space. New belt filter press control panels shall also be provided for the two remaining BFPs and integrated into the existing plant SCADA system. Replace failed and obsolete gravity belt thickener controls and instrumentation. Review operator control needs and provide information and control and evaluate appropriate location. Evaluate use of remote technology such as Wonderware InTouch Access Anywhere. Evaluate WAS and GBT Feed Pumps and controls to allow for control of GBT feed while still maintaining the options to use the gravity thickener next to Aeration Basin 1 and run (2) GBTs simultaneously. Provide new console and computer in the Solids Handling Building control room and CCTV to monitor the BFPs and truck loading. Demolish sludge/polymer mix tank at BFP 1 and 2 and design replacement piping to allow better access to presses. Design loading and unloading improvements, HVAC upgrades and general lighting improvements. Include re-coating of interior walls in entire Solids Handling Building. Design shall be completed to 30% under this contract.
AutoNDA by SimpleDocs

Related to SDWRF Dewatering Capacity Improvements

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

Time is Money Join Law Insider Premium to draft better contracts faster.