Rated Case Demonstration (minimum Ambient) Sample Clauses

Rated Case Demonstration (minimum Ambient). A capacity evaluation test will be performed utilizing available power from the refrigerant turbines, and within the design limits of the Liquefaction Facility to validate as best as possible the assumptions around the minimum ambient rated case used to set the hydraulic limits of the Liquefaction Facility. The test results will be compared to the simulation case to evaluate margins to design limits and identify if any have been exceeded.
AutoNDA by SimpleDocs

Related to Rated Case Demonstration (minimum Ambient)

  • Minimum Availability Borrower shall have minimum availability immediately following the initial funding in the amount set forth on the Schedule.

  • Service Availability You understand that Service availability is at all times conditioned upon the corresponding operation and availability of the communication systems used in communicating your instructions and requests to the Credit Union. We will not be liable or have any responsibility of any kind for any loss or damage thereby incurred by you in the event of any failure or interruption of such communication systems or services resulting from the act or omission of any third party, or from any other cause not reasonably within the control of the Credit Union.

  • EPP service availability Refers to the ability of the TLD EPP servers as a group, to respond to commands from the Registry accredited Registrars, who already have credentials to the servers. The response shall include appropriate data from the Registry System. An EPP command with “EPP command RTT” 5 times higher than the corresponding SLR will be considered as unanswered. If 51% or more of the EPP testing probes see the EPP service as unavailable during a given time, the EPP service will be considered unavailable.

  • Requesting Price Increase/Required Documentation Contractor must submit a written notification at least thirty (30) calendar days prior to the requested effective date of the change, setting the amount of the increase, along with an itemized list of any increased prices, showing the Contractor’s current price, revised price, the actual dollar difference and the percentage of the price increase by line item. Price change requests must include H-GAC Forms D Offered Item Pricing and E Options Pricing, or the documentation used to submit pricing in the original Response and be supported with substantive documentation (e.g. manufacturer's price increase notices, copies of invoices from suppliers, etc.) clearly showing that Contractor's actual costs have increased per the applicable line item bid. The Producer Price Index (PPI) may be used as partial justification, subject to approval by H-GAC, but no price increase based solely on an increase in the PPI will be allowed. This documentation should be submitted in Excel format to facilitate analysis and updating of the website. The letter and documentation must be sent to the Bids and Specifications manager, Xxxxxxx Xxxxxx, at Xxxxxxx.Xxxxxx@x-xxx.xxx Review/Approval of Requests If H-GAC approves the price increase, Contractor will be notified in writing; no price increase will be effective until Contractor receives this notice. If H-GAC does not approve Contractor’s price increase, Contractor may terminate its performance upon sixty (60) days advance written notice to H-GAC, however Contractor must fulfill any outstanding Purchase Orders. Termination of performance is Contractor’s only remedy if H-GAC does not approve the price increase. H-GAC reserves the right to accept or reject any price change request.

  • System Availability System Availability percentage is calculated as follows:  Total MinutesintheMonth −Downtime   System Availability%age =  Total MinutesintheMonth *100    System Availability SLA (“SLA”) 99.5% System Availability percentage during each Month for productive versions Credit 2% of Monthly Subscription Fees for each 1% below SLA, not to exceed 100% of Monthly Subscription Fees Excluded Downtime Total Minutes in the Month attributable to: (i) a Scheduled Downtime for which a Regular Maintenance Window is described in Section 4 below, or (ii) any other Scheduled Downtime according to Section 4 for which the customer has been notified at least five (5) business days prior to such Scheduled Downtime or (iii) unavailability caused by factors outside of SAP’s reasonable control, such as unpredictable and unforeseeable events that could not have been avoided even if reasonable care had been exercised. Scheduled Downtime Scheduled Downtime for the applicable Cloud Services to which customer has subscribed is set forth in Section 4 below entitled “Maintenance Windows for Cloud Services”.

  • Product Availability Under no circumstances shall Company be responsible to Representative or anyone else for its failure to fill accepted orders, or for its delay in filling accepted orders, when such failure or delay is due to strike, accident, labor trouble, acts of nature, freight embargo, war, civil disturbance, vendor problems or any cause beyond Company's reasonable control.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Minimum Call-Back Time Every employee who is called out and required to work in an emergency outside their regular working hours shall be paid for a minimum of two (2) hours at overtime rates and shall be paid from the time they leave home to report for duty until the time they arrive back upon proceeding directly from work.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • General Availability The commitment to availability specified in the letter of appointment shall be subject to mutually acceptable revision. Such revision will occur once per year, or, if mutually agreed between the Employer and the employee, on a more frequent basis. The Employer will issue a revised letter of appointment to reflect approved changes to employee’s general availability.

Time is Money Join Law Insider Premium to draft better contracts faster.