Randomization and Spontaneous Ordering Sample Clauses

Randomization and Spontaneous Ordering. ‌ One possible way of circumventing the impossibility result is through the use of randomization. The algorithm of Xxxxxx and Xxxxx [Xxxxxx and Xxxxx, 1983], for example, rely on the fact that, if agents keep exchanging messages in rounds, then there is a non-zero probability that they will all eventually receive the same set of messages in some round. The authors have called this property fair scheduling. The algorithms of Xxxxx [Xxxxx, 1983] and Ben-Or [Ben-Or, 1983] employ ran- domization in a different way. In their algorithms, if agents have no reason to opt for some proposal or another in some round, then they use a random bit generator to chose one. Given that there is a non zero probability that all chose the same random bit, agreement is reached with probability 1. Xxxxxx et al. [Xxxxxx et al., 2002a] later replaced the selection based on the random bit generator used by Xxxxx [Xxxxx, 1983] and Ben-Or [Ben-Or, 1983] for a selection based on the order in which messages are received. This is possible if, for every round, there is a non zero probability that messages will be received in the same order. These properties, somehow related to fair scheduling, are abstracted by weak ordering oracles [Xxxxxx et al., 2002b]. In specific, the algorithms of Xxxxxx et al. [Xxxxxx et al., 2002a], namely B-Consensus and R-Consensus in reference to Ben-Or and Xxxxx, use the weak atomic broadcast (WAB) oracle, which ensures that if processes keep exchanging broadcast messages then, in some rounds, the first 2.1 Consensus and the FLP Impossibility Result 11 message received by all running agents is the same. In the same work, the authors show that, with high probability, Ethernet broadcast satisfies the WAB specification. WAB based protocols are interesting from a practical perspective since they do not make any synchrony assumption. Nonetheless, B-Consensus and R-Consensus are of more theoretical than practical interest for their assumed failure and com- munication models: crash-stop and reliable links. From a pragmatic perspective, agents should be capable of reintegrating the system after a crash and tolerate mes- sage losses, being able to can make better use of highly-efficient communication means (e.g., UDP messages). Crash-Recovery WAB-Based Consensus We have extended the protocols of Xxxxxx et al. [Xxxxxx et al., 2002a] to the crash- recovery model with fairly lossy channels. Moreover, we defined these extended protocols using roles and relaxed the constrai...
AutoNDA by SimpleDocs

Related to Randomization and Spontaneous Ordering

  • Vaccination and Inoculation (a) The Employer agrees to take all reasonable precautions, including in-service seminars, to limit the spread of infectious diseases among employees.

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Clinical 2.1 Provides comprehensive evidence based nursing care to patients including assessment, intervention and evaluation.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Study Population ‌ Infants who underwent creation of an enterostomy receiving postoperative care and awaiting enterostomy closure: to be assessed for eligibility: n = 201 to be assigned to the study: n = 106 to be analysed: n = 106 Duration of intervention per patient of the intervention group: 6 weeks between enterostomy creation and enterostomy closure Follow-up per patient: 3 months, 6 months and 12 months post enterostomy closure, following enterostomy closure (12-month follow-up only applicable for patients that are recruited early enough to complete this follow-up within the 48 month of overall study duration).

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Musculoskeletal Injury Prevention and Control (a) The Hospital in consultation with the Joint Health and Safety Committee (JHSC) shall develop, establish and put into effect, musculoskeletal prevention and control measures, procedures, practices and training for the health and safety of employees.

Time is Money Join Law Insider Premium to draft better contracts faster.