Prefeasibility Study Report Sample Clauses

Prefeasibility Study Report. (a) If the Rail Study is a Feasibility Study, then on or before the date that is 5 Business Days after the Commencement Date, Aurizon Network must provide the Study Funder with a copy of the final Rail Study Report prepared by Aurizon Network for the Pre-feasibility Study for the Expansion.
AutoNDA by SimpleDocs
Prefeasibility Study Report. Promptly after the date of this Agreement, Aurizon Network must provide the Study Funder with a copy of the final rRail sStudy rReport prepared by Aurizon Network in respect of the prefeasibility stage of the rRail sStudy for the Expansion.]27

Related to Prefeasibility Study Report

  • Feasibility Study Buyer will, at Buyer's expense and within ____ days from Effective Date ("Feasibility Study Period"), determine whether the Property is suitable, in Buyer's sole and absolute discretion, for ___________________ use. During the Feasibility Study Period, Buyer may conduct a Phase I environmental assessment and any other tests, analyses, surveys and investigations ("Inspections") that Buyer deems necessary to determine to Buyer's satisfaction the Property's engineering, architectural and environmental properties; zoning and zoning restrictions; subdivision statutes; soil and grade; availability of access public roads, water, and other utilities; consistency with local, state and regional growth management plans, availability of permits, government approvals, and licenses; and other inspections that Buyer deems appropriate to determine the Property's suitability for the Buyer's intended use. If the Property must be rezoned, Buyer will obtain the rezoning from the appropriatx xxxernment agencies. Seller will sign all documents Buyer is required to file in connection with development or rezoning approvals. Seller gives Buyer, its agents, contractors and assigns, the right to enter the Property at any time during the Feasibility Study Period for the purpose of conducting inspections; provided, however, that Buyer, its agents, contractors and assigns enter the Property and conduct inspections at their own risk. Buyer will indemnify and hold Seller harmless from xxxxes, damages, costs, claims and expenses of any nature, including attorney's fees, expenses and liability incurred in application for rezoning or related proceedings, and from liability to any person, arising from the conduct of any and all inspections of any work authorized by Buyer. Buyer will not engage in any activity that xxxxx result in a construction lien being filed against the Property without Seller's prior written consent. If this transaction does not close, Buyer will, at Buyer's expense, (1) repair all damages to the Property resulting from the Inspections and return the Property to the condition it was in prior to conduct of the Inspections, and (2) release to Seller all reports and other work generated as a result of the Inspections. Buyer will deliver written notice to Seller prior to the expiration of the Feasibility Study Period of Buyer's determination of whether or not the Properxx xx acceptable. Buyer's failure to comply with this notice requirement will constitute acceptance of the Property as suitable for Buyer's intended use in its "as is" condition. If the Property is unacceptable to Buyer and written notice of this fact is timely delivered to Seller, this Contract will be deemed terminated as of the day after the Feasibility Study period ends and Buyer's deposit(s) will be returned after Escrow Axxxx receives proper authorization form all interested parties.

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Technical Feasibility of String While ICANN has encouraged and will continue to encourage universal acceptance of all top-­‐level domain strings across the Internet, certain top-­‐level domain strings may encounter difficulty in acceptance by ISPs and webhosters and/or validation by web applications. Registry Operator shall be responsible for ensuring to its satisfaction the technical feasibility of the TLD string prior to entering into this Agreement.

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Development cooperation 1. The Parties recognise that development cooperation is a crucial element of their Partnership and an essential factor in the realisation of the objectives of this Agreement as laid down in Article 1. This cooperation can take financial and non-financial forms.

  • Project Reports 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than one month after the end of the period covered by such report.

Time is Money Join Law Insider Premium to draft better contracts faster.