Maplewood Landfill Bioreactor System Sample Clauses

Maplewood Landfill Bioreactor System. 2.2.1.1 Overview In this section, the proposed bioreactor system for the Maplewood Landfill is described. In general, the system is designed to distribute leachate throughout the approximate 10- acre test area as uniformly as possible and to maintain the moisture content of waste at a level high enough to increase biodegradation. The total footprint is about 48 acres as of May 2000. The detailed design of the system is presented in the design report [GeoSyntec, 2000a]. In this section, a brief summary of the design is presented to illustrate the features of the proposed project. The information presented in this section is also referenced in Section 3 (i.e., Project XL Criteria) to describe the manner in which the proposed program complies with the Project requirements of superior environmental performance. First, in Section 2.2.1.2, the bioreactor system layout and design is described. In Section 2.2.1.3, the typical methods for construction of the system are described. Finally, in Sections 2.2.1.4 and 2.2.1.5, proposed methods for monitoring and data analysis/reporting are described.
AutoNDA by SimpleDocs

Related to Maplewood Landfill Bioreactor System

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Sites Sites shall mean the locations set forth in the Contract Documentation.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.