Introduction to Model-Based Testing Sample Clauses

Introduction to Model-Based Testing. (MBT) Model-based testing (MBT) is a variant of testing that relies on explicit behavior models that encode the intended behavior of a system and possibly the behavior of its environment. There are several definitions of model-based testing: Model-based testing is the generation of executable black-box tests from a behavioral model of the SUT (System Under Test) [4]. Model-based Testing provides a technique for automatic generation of test cases using models extracted from software artifacts [5]. Model-based testing is a testing technique where the runtime behavior of an implementation under test is checked against predictions made by a formal specification, or model (Xxxxx Xxxxxxxx, Microsoft Research). There are also different approaches known as model-based testing [4]: Generation of test input data from a domain model Generation of test cases from an environment model Generation of test cases with oracles from a behavior model Generation of test scripts from abstract tests In terms of model-based testing, the necessity to validate the model implies that the model must be simpler than the SUT, or at least easier to check, modify and maintain. Otherwise, the efforts of validating the model would equal the efforts of validating the SUT (see Figure 2-1). Figure 2-1: Model-based testing uses models of the SUT and its environment [9] The model describing the SUT is usually an abstract, partial presentation of the system under test's desired behavior. The test cases derived from this model are functional tests on the same level of abstraction as the model. These test cases are collectively known as the abstract test suite. The abstract test suite cannot be directly executed against the system under test because it is on the wrong level of abstraction. Therefore an executable test suite must be derived from the abstract test suite that can communicate with the system under test. This is done by mapping the abstract test cases to concrete test cases suitable for execution [6]. Figure 2-2: Model based testing [6]
AutoNDA by SimpleDocs

Related to Introduction to Model-Based Testing

  • Repair Testing At the time of repair of a LIS trunk group, at no additional charge, tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Vehicle Base Specifications Note: The actual vehicle awarded may exceed the minimum specifications stated below. The Authorized User may elect to add additional Options, delete Options, or substitute a vehicle feature that is an Option with another Option. See Contract Section III.6

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Specification and Service Levels The Specification sets out the Services that the Contractor has undertaken to provide. The Specification includes Service Levels setting out particular levels of service that the Contractor has undertaken to meet.

  • Billing Specifications 55.6.1 The Parties agree that billing requirements and outputs will be consistent with the Ordering & Billing Form (OBF) and also with Telcordia Technologies Billing Output Specifications (BOS).

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Milestone schedule Please state the status and progress of each Milestone and identify any completed Milestone(s) for the previous calendar quarter.