Handling Motive Power Sample Clauses

Handling Motive Power. (1) All motive power in road or yard service of this Carrier (except as otherwise provided herein) will be handled exclusively by Engineers in active service holding rights as Locomotive Engineers on the Engineers' seniority list. All locomotives going over the road under their own power will be in charge of an Engineer in active service. An Engineer will not be required to assume responsibility of other than the locomotive that the Engineer is in charge of en route.
AutoNDA by SimpleDocs

Related to Handling Motive Power

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Real and Reactive Power Control 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 ARTICLE 10. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43 ARTICLE 11. PERFORMANCE OBLIGATION 43

  • Variance Power All funds established at the Foundation are subject to the Foundation’s “variance power”, required by Treasury Regulations for the Foundation and its donors to enjoy the more favorable income tax treatment of a community foundation as opposed to the less favorable income tax treatment of a private foundation. Treasury Regulations Section 170A-9(e)(11)(v)(B)(1) specifically states that the governing body of a community foundation must have the power “to modify any restriction or condition on the distributions of funds for any specified charitable purpose or to specified organizations if, in the sole judgment of the governing body (without the necessity of approval by any participating trustee, custodian or agent), such restriction becomes, in effect, unnecessary, incapable of fulfillment, or inconsistent with the charitable needs of the community or area served”.

  • Police Powers The Grantee agrees to comply with the terms of any lawfully adopted generally applicable local ordinance necessary to the safety, health, and welfare of the public, to the extent that the provisions of the ordinance do not have the effect of limiting the benefits or expanding the obligations of the Grantee that are granted by this Franchise. This Franchise is a contract and except as to those changes which are the result of the Grantor’s lawful exercise of its general police power, the Grantor may not take any unilateral action which materially changes the mutual promises in this contract.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Corporate Power The Company has all requisite corporate power to execute and deliver this Agreement and to carry out and perform its obligations under the terms of this Agreement.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • All-Requirements Power Supply The service under which the Competitive Supplier provides all of the electrical energy, capacity, reserves, and ancillary services, transmission services, transmission and distribution losses, congestion management, and other such services or products necessary to provide firm power supply to Participating Consumers at the Point of Delivery.

  • Contractor’s Power and Authority The Contractor warrants that it has the full power and authority to grant the rights herein granted and will hold the County hereunder harmless from and against any loss, cost, liability and expense, including reasonable attorney fees, arising out of any breach of this warranty. Further, the Contractor avers that it will not enter into any arrangement with any third party which might abridge any rights of the County under this Contract.

  • Payment for Reactive Power NYISO shall pay Developer for reactive power or voltage support service that Developer provides from the Large Generating Facility in accordance with the provisions of Rate Schedule 2 of the NYISO Services Tariff.

Time is Money Join Law Insider Premium to draft better contracts faster.