Grading & Excavation Permit Sample Clauses

Grading & Excavation Permit. The Developer shall obtain a grading and excavation permit prior to commencing construction.
AutoNDA by SimpleDocs

Related to Grading & Excavation Permit

  • Building Permit As soon as the Final Interior Plans have been approved by Landlord and Tenant, Landlord shall apply for a building permit for the Interior Improvements, and shall diligently prosecute to completion such approval process.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Shifting of obstructing utilities The Concessionaire shall, subject to Applicable Laws and with assistance of the Authority, undertake shifting of any utility including electric lines, water pipes and telephone cables, to an appropriate location or alignment within or outside the Site if and only if such utility causes or shall cause a material adverse effect on the construction, operation or maintenance of the Project. The cost of such shifting shall be borne by the Authority or by the entity owning such utility, if the Authority so directs, and in the event of any delay in shifting thereof, the Concessionaire shall be excused for failure to perform any of its obligations hereunder if such failure is a direct consequence of delay on the part of the entity owning such electric lines, water pipes or telephone cables, as the case may be.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Occupancy Permit CLEC occupancy of Structure shall be pursuant to a permit issued by CBT for each requested Attachment. Any such permit shall terminate (a) if CLEC's franchise, consent or other authorization from federal, state, county or municipal entities or private property owners is terminated, (b) if CLEC has not placed and put into service its Attachments within one hundred eighty (180) days from the date CBT has notified CLEC that such Structure is available for CLEC's Attachments, and such delay is not caused by an CBT Delaying Event, (c) if CLEC ceases to use such Attachment for any period of one hundred eighty (180) consecutive days, (d) if CLEC fails to comply with a material term or condition of this Article XVI and does not correct such noncompliance within sixty (60) days after receipt of notice thereof from CBT or (e) if CBT ceases to have the right or authority to maintain its Structure, or any part thereof, to which CLEC has Attachments. If CBT ceases to have the right or authority to maintain its Structure, or any part thereof, to which CLEC has Attachments, CBT shall (i) provide CLEC notice within ten (10) Business Days after CBT has knowledge of such fact and (ii) not require CLEC to remove its Attachments from such Structure prior to CBT's removal of its own attachments. CBT will provide CLEC with at least sixty (60) days written notice prior to (x) terminating a permit or service to an CLEC Attachment or removal thereof for a material breach of the provisions of this Article XVI, (y) any increase in the rates for Attachments to CBT's Structure permitted by the terms of this Agreement, or (z) any modification to CBT's Structure to which CLEC has an Attachment, other than a modification associated with routine maintenance or as a result of an emergency. If CLEC surrenders its permit for any reason (including forfeiture under the terms of this Agreement), but fails to remove its Attachments from the Structure within one hundred eighty (180) days after the event requiring CLEC to so surrender such permit, CBT shall remove CLEC's Attachments at CLEC's expense.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Building Permits All building permits required for the construction of the Improvements have been obtained prior to the commencement of the construction of the Improvements and copies of same will be delivered to Lessor.