Geotechnical Consultation Sample Clauses

Geotechnical Consultation. Provide consultation as necessary to the design and construction team. Respond to RFI’s and provide additional or alternative design recommendations as necessary.
AutoNDA by SimpleDocs

Related to Geotechnical Consultation

  • Technical Consultations 1. A Party may initiate technical consultations with another Party through the respective contact points with the aim of resolving any matter arising under this Chapter.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Tribal Consultation 1. For FEMA Undertakings on Tribal lands or potentially affecting properties of religious and cultural significance to Tribes, and where no tribe-specific consultation agreements or protocols are in place, FEMA shall consult with affected Tribe(s) or in accordance with 36 CFR Part 800. In determining who the affected Tribe(s) may be, FEMA will first establish that it is a type of Undertaking with potential to affect historic properties with religious and cultural significance and may consult with the SHPO and Tribe(s), and may access the National Park Service (NPS) Native American Consultation Database or other tools to identify geographic tribal interests.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Prior consultation It is expected that the Parents, or duly authorised education guardian, will consult personally with the Head or with the Head's authorised deputy before Notice of Withdrawal is given by the Parents.

  • Technical Cooperation 1. The Parties shall strengthen their cooperation in the field of standards, technical regulations, metrology, market surveillance, accreditation and conformity assessment systems with a view to increasing the mutual understanding of their respective systems and facilitating access to their respective markets. To that end, they may establish regulatory dialogues at both horizontal and sectoral levels.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following;

Time is Money Join Law Insider Premium to draft better contracts faster.