Geotechnical Observation Sample Clauses

Geotechnical Observation. Site visits by our engineer and/or geologist would be performed where site conditions, such as undocumented fill removal, warrant. In addition, geologist or engineer time would be incurred for site visits, meetings and miscellaneous consultation during the construction period.
AutoNDA by SimpleDocs

Related to Geotechnical Observation

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Observations The Evaluator’s first observation of the Educator should take place by November 15. Observations required by the Educator Plan should be completed by May 15th. The Evaluator may conduct additional observations after this date. The Evaluator is not required nor expected to review all the indicators in a rubric during an observation.

  • Formal Observation The instructional employee and the principal/administrator shall review using the mid-year Reflection Questions in the evaluation manual – Student Achievement Outcomes and make adjustments as needed to increase the likelihood of a positive goal outcome.

  • Formal Observations 1. A minimum of two (2) formal observations shall be conducted to support the final summative evaluation. All formal observations shall last a minimum of thirty (30) consecutive minutes and will take place between September 15 and April 30. There will be a minimum of fifteen (15) work days between the first two (2) formal observations.

  • Construction Observation The Consultant shall make periodic on-site observations of the Project in accordance with Exhibit A. The purpose of the on-site observations will be to observe the progress and quality of the construction work being carried on to determine if the work is proceeding in accordance with the Construction Documents. Unless otherwise stated in Exhibit A, the Consultant shall not be required to make exhaustive or continuous on-site observations to check the quality or quantity of the work.

  • Informal Observation Additional evaluation of employees may occur through informal observations by the Employer. It may not be necessary to reduce such evaluations to writing, and a verbal discussion between the Employer and the employee concerning the informal observations may suffice. If a written evaluation is deemed necessary, Procedures C and D as outlined above shall be followed.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Informal Observations A. An informal observation is an observation that is not required to be pre-scheduled.

  • Observation The Town shall have the right to make reasonable engineering observations at the Developer's expense, as the Town may request. Observation, acquiescence in, or approval by any engineering inspector of the construction of physical facilities at any particular time shall not constitute the approval by the Town of any portion of the construction of such Public Improvements. Such approval shall be made by the Town only after completion of construction and in the manner hereinafter set forth.

  • Classroom Observation Classroom observations shall be conducted at least once for all unit members who have not met the threshold for reappointment as defined in Section 10.02 of Article10. Effective fall 2006 classroom observations shall be conducted on DCE form E3. Classroom observations may be conducted for any unit member, at the discretion of the President of the College, or designee thereof, for stated written reasons. Results of said observation shall be communicated to the unit member in writing. The unit member shall be afforded the opportunity to discuss the classroom observation with the evaluator and to respond in writing.

Time is Money Join Law Insider Premium to draft better contracts faster.