Gauging Process Sample Clauses

Gauging Process. Gauging the liquid in the tanks of the LNG Tankers and measuring of liquid temperature, vapor temperature and vapor pressure in each LNG tank, trim and list of the LNG Tankers, and atmospheric pressure shall be performed, or caused to be performed, by Buyer before and after loading. Seller’s representative shall have the right to be present while all measurements are performed and shall verify the accuracy and acceptability of all such measurements. The first gauging and measurements shall be made immediately before the commencement of loading. The second gauging and measurements shall take place immediately after the completion of loading.
AutoNDA by SimpleDocs
Gauging Process. Gauging the liquid in the tanks of the LNG Vessels and measuring of liquid temperature, vapor temperature and vapor pressure in each LNG tank, trim and list of the LNG Vessels, and atmospheric pressure shall be performed, or caused to be performed, by Customer before and after unloading. SABINE’s representative shall have the right to be present while all measurements are performed and shall verify the accuracy and acceptability of all such measurements. The first gauging and measurements shall be made immediately before the commencement of unloading. The second gauging and measurements shall take place immediately after the completion of unloading. The liquid level in the LNG Vessel before and after the unloading shall be determined by at least two (2) separate tank gaugings to be conducted at least fifteen (15) minutes apart.
Gauging Process. Gauging the liquid in the tanks of the LNG Vessels and measuring of liquid temperature, vapour temperature and vapour pressure in each LNG tank, trim and list of the LNG Vessels, and atmospheric pressure shall be performed, or caused to be performed, by Terminal User before and after unloading. Terminal Owner’s representative shall have the right to be present while all measurements are performed and shall verify the accuracy and acceptability of all such measurements. The initial gauging shall be made immediately before the commencement of unloading and upon securing the gas valve to the engine room. The final gauging shall take place immediately after the completion of unloading and before opening the gas valve to the engine room. The condition of the vessel’s manifold and associated deck piping must be the same at the time of each measurement (i.e., purged and drained).

Related to Gauging Process

  • Ordering Process 6.4.1 CLEC, or CLEC's agent, shall act as the single point of contact for its End User Customers' service needs, including without limitation, sales, service design, order taking, Provisioning, change orders, training, maintenance, trouble reports, repair, post-sale servicing, Billing, collection and inquiry. CLEC's End User Customers contacting Qwest in error will be instructed to contact CLEC; and Qwest's End User Customers contacting CLEC in error will be instructed to contact Qwest. In responding to calls, neither Party shall make disparaging remarks about each other. To the extent the correct provider can be determined, misdirected calls received by either Party will be referred to the proper provider of local Exchange Service; however, nothing in this Agreement shall be deemed to prohibit Qwest or CLEC from discussing its products and services with CLEC's or Qwest's End User Customers who call the other Party seeking such information.

  • Bidding Process 3.1. Bidding shall generally commence based on the sequence of the lot being shown on the PAH Website. However the Auctioneer has the right to vary the sequence without having to give prior notice to the intended bidders.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Testing Procedures Testing will be conducted by an outside certified Agency in such a way to ensure maximum accuracy and reliability by using the techniques, chain of custody procedures, equipment and laboratory facilities which have been approved by the U.S. Department of Health and Human Services. All employees notified of a positive controlled substance or alcohol test result may request an independent test of their split sample at the employee’s expense. If the test result is negative the Employer will reimburse the employee for the cost of the split sample test.

  • Offering Process In connection with the Offering, each of the Co-Managers will:

  • BILLING PROCEDURE a. The Contractor shall submit, not more than semi-monthly, properly completed A-19 vouchers (the "voucher") to one of the following: The Department of Children, Youth, and Families Attn: Xxxxx Xxxxxxxx PO Box 40970 Olympia WA 98504-0970 Or, email a scan of an original, signed A-19 voucher directly to the DCYF Contract Manager at xxxxx.xxxxxxxx@xxxx.xx.xxx

  • Billing Procedures (a) PROVIDER agrees all claims shall be submitted to OHCA in a format acceptable to OHCA and in accordance with the OHCA Provider Manual.

  • Standard Operating Procedures Over approximately the past eight years, the Parties have been supplying select Products to one another for use in the operation of their respective businesses within the United States of America, Canada and Mexico. The Parties developed and been following certain standard operating procedures in connecting with, among other topics, forecasting, production planning, ordering, delivering and resolving claims on the Products supplied to one another (the “Current SOPs”). The Parties will be updating their respective business systems over the next six months, and the updates to these business systems will require the Parties to modify the Current SOPs. Once the Parties have completed the updates to the business systems and agreed on the necessary modifications to the Current SOPs, the Parties will sign a written amendment to this Agreement appending the updated standard operating procedures (the “Updated SOPs”). Until the Parties have signed a written amendment appending the Updated SOPs, the parties will continue to follow the Current SOPs. The Parties will comply with the applicable SOPs in connection with the purchase and sale of products identified in a Purchase Schedule. The Parties may add terms and conditions to, and amend the terms and conditions of, the SOP in a Purchase Schedule, but any additional and amended terms and conditions in a Purchase Schedule supplementing and modifying the SOP will only apply the specific products identified in that Purchase Schedule for its duration.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.