LNG Vessels Sample Clauses

LNG Vessels. Subject to Xxxxxxx 00.0, Xxxxx Xxxxxxx shall include the following events and circumstances as to an LNG Vessel: (i) act of God, fire, explosion, flood, atmospheric disturbance, lightning, storm, hurricane, typhoon, tornado, or epidemic; (ii) war (whether declared or undeclared), riot, civil war, blockade, insurrection, civil disturbance, or act of or the serious threat of acts of sabotage, piracy or terrorism; (iii) strike, lockout, mutiny or other industrial disturbance; (iv) the inoperability or removal of the LNG Vessel from service due to loss, serious accidental damage or other serious failure; and (v) any non-discriminatory acts of a Governmental Authority, including the withdrawals of any Approval.
AutoNDA by SimpleDocs
LNG Vessels. 35 9.2 Freeport Facility Marine Operations Manual........................38 9.3 LNG Vessel Inspections; Right to Reject LNG Vessel................39
LNG Vessels. (a) Customer to Cause LNG Vessels to Comply. Customer shall be responsible for the transportation of LNG from the Loading Port to the Freeport Facility. In this regard, Customer shall cause each LNG Vessel to comply with the requirements of this Article 9 in all respects.

Related to LNG Vessels

  • Vessels Each Vessel is

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • DELIVERY PRESSURE Xxxxxx agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

  • Passengers THE CARRIER shall be liable for damages resulting from the death of a Passenger or any bodily injury sustained by a Passenger if the act causing the damages took place on board the aircraft or during boarding or deboarding operations.

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Contractor’s Equipment Payment for required equipment owned by the Construction Manager or an affiliate of the Construction Manager will be based solely on an hourly rate derived by dividing the current appropriate monthly rate by 176 hours. No payment will be made under any circumstances for repair costs, freight and transportation charges, fuel, lubricants, insurance, any other costs and expenses, or overhead and profit. Payment for such equipment made idle by delays attributable to the Government will be based on one-half the derived hourly rate under this subsection.

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

Time is Money Join Law Insider Premium to draft better contracts faster.