FINAL DESIGN SERVICES. This task consists of all services necessary to take project from Task 1 Preliminary Design Services through the Final Design Services and may include the following itemized services. 2.1 Address City comments from the Task 1 City review. 2.2 Incorporate design features, as necessary, to meet the requirements outlined in the Project Design Report. 2.3 Provide project layout to include lot lines (front and side) and addresses of all properties (adjacent to construction to or directly impacted by construction). 2.4 Determine removal limits with approval of City of Rapid City representative.
Appears in 1 contract
Sources: Professional Services
FINAL DESIGN SERVICES. This task consists of all services necessary to take the project from Task 1 Preliminary Design Services through the Final Design Services Services, and may include the following itemized services.
2.1 Address . Effort may be shifted between tasks and subtasks for the entire scope of work. The Consultant shall allow 15 working days for City comments from the Task 1 City review.
2.2 Incorporate design features, as necessary, to meet the requirements outlined in review of the Project Design Reportreport and Conceptual Design submittal, and the 65% and 100% complete plans; specifications; geotechnical report; and opinion of probable construction cost submittal.
2.3 Provide project layout to include lot lines (front and side) and addresses of all properties (adjacent to construction to or directly impacted by construction).
2.4 Determine removal limits with approval of City of Rapid City representative.
Appears in 1 contract
Sources: Professional Services