FINAL ACCEPTANCE WHEN FINAL LIFT OF ASPHALT DEFERRED Sample Clauses

FINAL ACCEPTANCE WHEN FINAL LIFT OF ASPHALT DEFERRED. In the event that Owner has completed all of the obligations under this Owner Extension Agreement except for the installation of the final lift of asphalt and making adjustments to the elevations of hydrants, valves, and other appurtenances to final grade, and Owner desires the property to be eligible for water service, then the Association may grant final acceptance subject to the terms and conditions listed below that are in addition to the terms and conditions listed in the subsection above.
AutoNDA by SimpleDocs

Related to FINAL ACCEPTANCE WHEN FINAL LIFT OF ASPHALT DEFERRED

  • Are There Penalties for Early Distribution from a Xxxx XXX As indicated above, earnings on your contributions, as well as amounts contributed to a Xxxx XXX as a rollover from a Traditional IRA, that are distributed before certain events are subject to various taxes. Please see IRS Publication 590 for further information about Xxxx XXX rules and restrictions.

  • Additional Wet Weather Procedure 14.15.1 Remaining On Site Where, because of wet weather, the employees are prevented from working:

  • Final Acceptance When the Project/Service or any portion thereof, as designated by the COUNTY, is ready for its intended use, the COUNTY and any other invited parties shall make an inspection of the Project/Service, to verify its completeness and develop a punch list of items needing completion or correction before final payment will be made. CONTRACTOR shall have ten (10) calendar days to correct all deficiencies. An eighty-dollar ($80.00) re-inspection fee shall be applied for the third inspection and any required re-inspection thereafter. The COUNTY shall have the right to exclude CONTRACTOR from those portions of the work designated as complete after the inspection; provided, however, that CONTRACTOR will have reasonable access for the time allotted by the COUNTY to complete or correct items on the punch list. When the work provided for under this Agreement has been completely performed by CONTRACTOR, and the final inspection has been made by the COUNTY, a final invoice will be prepared by the CONTRACTOR. The amount of this invoice, less any sums that may have been deducted or retained under the provisions of this Agreement, will be paid to CONTRACTOR in accordance with this Agreement, and after CONTRACTOR has agreed in writing to accept the balance due, as determined by the COUNTY, as full settlement of the account under the contract and of all claims in connection therewith. Occupancy by the COUNTY alone does not constitute final acceptance.

  • Definition of Building Where Lift Required 1.1 A passenger/materials lift shall be provided on a building which shall, when complete, consist of more than six (6) storey levels excluding the roof, parapets and basement levels (if any), but including the ground floor. (Refer to Sub Clause 2.1 herein.)

  • DISTRIBUTION OF CONTRACTOR PRICE LIST AND CONTRACT APPENDICES Contractor shall provide Authorized Users with electronic copies of the Contract, including price lists and Appendices, upon request. OGS CENTRALIZED CONTRACT MODIFICATIONS Contract Updates will be handled as provided in Appendix C – Contract Modification Procedures.

  • 361 Acceptance of Specified Roads Specified Road work may be accepted subject to completion of clearing work that does not affect the road structure when completion is delayed for reasons beyond control of Purchaser, such as adverse weather. Specified Road work may be accepted subject to completion of planting and seeding for soil stabilization when completion is delayed for reasons beyond control of Purchaser, such as seasonal limitations. Purchaser shall complete planting or seeding on such road during the next suitable planting season. Specified Road work may be conditionally accepted prior to the application of dust palliatives when application is not necessary to prevent dusting of the road surface due to climatic conditions. Purchaser shall apply dust palliative on such roads prior to use during periods when dusting may occur. Prior to request for final inspection, Specified Road work, roadways, borrow pits, and quarries, occupied and no longer needed by Purchaser in connection with Purchaser’s Operations, shall be cleared of all rubbish, excess materials, and temporary structures.

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • Rollovers of Settlement Payments From Bankrupt Airlines If you are a qualified airline employee who has received a qualified airline settlement payment from a commercial airline carrier under the approval of an order of a federal bankruptcy court, you are allowed to roll over up to 90 percent of the proceeds to your Traditional IRA, within 180 days after receipt of such amount, or by a later date if extended by federal law. If you make such a rollover contribution, you may exclude the amount rolled over from your gross income in the taxable year in which the airline settlement payment was paid to you. If you are a qualified airline employee who has received a qualified airline settlement payment from a commercial airline carrier under the approval of an order of a federal bankruptcy court in a case filed after September 11, 2001, and before January 1, 2007, you are allowed to roll over any portion of the proceeds into your Xxxx XXX within 180 days after receipt of such amount, or by a later date if extended by federal law. For further detailed information and effective dates you may obtain IRS Publication 590-A, Contributions to Individual Retirement Arrangements (IRAs), from the IRS or refer to the IRS website at xxx.xxx.xxx.

  • Traditional IRA-to-Xxxx XXX Conversions If you convert to a Xxxx XXX, the amount of the conversion from your Traditional IRA to your Xxxx XXX will be treated as a distribution for income tax purposes, and is includible in your gross income (except for any nondeductible contributions). Although the conversion amount generally is included in income, the 10 percent early distribution penalty tax will not apply to conversions from a Traditional IRA to a Xxxx XXX, regardless of whether you qualify for any exceptions to the 10 percent penalty tax. If you are required to take a required minimum distribution for the year, you must remove your required minimum distribution before converting your Traditional IRA.

  • How are Required Minimum Distributions Computed A required minimum distribution (“RMD”) is determined by dividing the account balance (as of the prior calendar year end) by the distribution period. For lifetime RMDs, there is a uniform distribution period for almost all IRA owners of the same age. The uniform distribution period table is based on the joint life and last survivor expectancy of an individual and a hypothetical beneficiary 10 years younger. However, if the IRA owner’s sole beneficiary is his/her spouse and the spouse is more than 10 years younger than the account owner, then a longer distribution period based upon the joint life and last survivor life expectancy of the IRA owner and spouse will apply. An IRA owner may, however, elect to take more than his/her RMD at any time.