Facility Operating Constraints Sample Clauses

Facility Operating Constraints. The Facility has the capacity to accommodate approximately 400 trains per week. Other Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by ABP from time to time. The Facility has 5 Stabling lines which can be used for Stabling, Operational Stabling, and Weekend Stabling.
AutoNDA by SimpleDocs
Facility Operating Constraints. The Facility has the capacity to accommodate approximately:  Newport Docks - 84 trains per week  Cardiff Docks - 84 trains per week  Xxxxx Docks - 56 trains per week  Swansea Docks - 84 trains per week No stabling facilities are available at the Facility but there is availability at adjacent facilities operated by XX Xxxxxxxx at Newport, Cardiff and Swansea. The Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by ABP from time to time.
Facility Operating Constraints. Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by Freightliner from time to time.
Facility Operating Constraints. The Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by DBCi from time to time. Any amendments to the Facility Operating Constraints shall only be made with the prior consent of Rail for London (not to be unreasonably withheld). Should the parties fail to agree any changes to the Facility Operating Constraints as aforesaid then the matter may be referred as a Dispute to be resolved in accordance with Clause 12.
Facility Operating Constraints. The facility has the capacity to accommodate [ insert capacity – trains per week/maximum train length or other measure ] Other Facility Operating Constraints will be specified in the relevant Safe System of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by DB Cargo from time to time. The Facility has [ ] lines which can be used for [Stabling, Operational Stabling].
Facility Operating Constraints. Access to the Facility to operate Train Services between the Network and Three Bridges LMD (RH10 1LY) is available from 0001hrs Monday to 2359hrs Sunday . Other Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by the Facility Owner from time to time.

Related to Facility Operating Constraints

  • Facility Operations Seller shall ensure that all Facility components are operated and maintained safely and in a manner designed to meet the Warranty Specifications and Performance Standards and as otherwise required under this Agreement.

  • Procedural and Operational Requirements By accepting and using the Financial Assistance awarded under this Agreement and for this Program Element, LPHA agrees to conduct activities in accordance with the following requirements:

  • Contractual and Operational Compliance Audits (a) ICANN may from time to time (not to exceed twice per calendar year) conduct, or engage a third party to conduct, contractual compliance audits to assess compliance by Registry Operator with its representations and warranties contained in Article 1 of this Agreement and its covenants contained in Article 2 of this Agreement. Such audits shall be tailored to achieve the purpose of assessing compliance, and ICANN will (a) give reasonable advance notice of any such audit, which notice shall specify in reasonable detail the categories of documents, data and other information requested by ICANN, and

  • Management and Operation of Business 37 6.1 Management...................................................................................37 6.2 Certificate of Limited Partnership...........................................................38 6.3 Restrictions on General Partner's Authority..................................................38 6.4 Reimbursement of the General Partner.........................................................39 6.5

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Maintaining Records; Access to Properties and Inspections Maintain all financial records in accordance with GAAP and permit any persons designated by the Administrative Agent or, upon the occurrence and during the continuance of an Event of Default, any Lender to visit and inspect the financial records and the properties of Holdings, the Borrower or any of the Subsidiaries at reasonable times, upon reasonable prior notice to Holdings or the Borrower, and as often as reasonably requested and to make extracts from and copies of such financial records, and permit any persons designated by the Administrative Agent or, upon the occurrence and during the continuance of an Event of Default, any Lender upon reasonable prior notice to Holdings or the Borrower to discuss the affairs, finances and condition of Holdings, the Borrower or any of the Subsidiaries with the officers thereof and independent accountants therefor (subject to reasonable requirements of confidentiality, including requirements imposed by law or by contract).

  • Management and Operations of Business Except as otherwise expressly provided in this Agreement, all powers to control and manage the business and affairs of the Partnership shall be vested exclusively in the General Partner; the Limited Partner shall not have any power to control or manage the Partnership.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.