EXISTING XXXXX OR SEPTIC TANKS Sample Clauses

EXISTING XXXXX OR SEPTIC TANKS. To fill in or otherwise remove any existing xxxxx or septic tanks on this Development to the satisfaction of the Sarnia-Lambton Health Unit, the St. Clair Region Conservation Authority and the Town. The Owner agrees at its own expense, to plug any oil or gas well or dispose of any storage tanks, located within the Lands as described in Schedule “A” in accordance with the requirements of the Ministry of the Environment and the Ministry of Natural Resources. The Owner agrees to cease all construction work in the area in which an unplugged gas or oil well or storage tank is located and shall immediately report the existence of any such well or storage tank to the Manager of Operations, the Department of Natural Resources and the Ministry of the Environment, and any other regulating agency concerned with unplugged oil/uncapped or gas xxxxx or storage tanks. The Owner agrees to carry out all the requirements of any regulatory agency in the plugging of any oil or gas well or disposal of any storage tanks and pay all associated costs accordingly. All work shall be completed in accordance with the Environmental Protection Act – Ontario Reg 153/04. The Owner is released from the responsibilities of this section only after the following:
AutoNDA by SimpleDocs

Related to EXISTING XXXXX OR SEPTIC TANKS

  • Unbundled Voice Xxxx - XX0 (XXX-XX0). Loops are 2-wire loop start circuits, will be non-designed, and will not have remote access test points. OC will be offered as a chargeable option on XX0 Xxxxx when reuse of existing facilities has been requested by NewPhone, however, OC is always required on UCLs that involve the reuse of facilities that are currently providing service. NewPhone may also order OC-TS when a specified conversion time is requested. OC-TS is a chargeable option for any coordinated order and is billed in addition to the OC charge. An Engineering Information (EI) document can be ordered as a chargeable option. The EI document provides Loop Make-Up information which is similar to the information normally provided in a Design Layout Record (DLR). Upon issuance of a non-coordinated order in the service order system, XX0 Xxxxx will be activated on the due date in the same manner and time frames that BellSouth normally activates POTS-type Loops for its customers.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Unbundled Voice Loop – SL2 (UVL-SL2 Loops may be 2-wire or 4-wire circuits, shall have remote access test points, and will be designed with a DLR provided to NewPhone. SL2 circuits can be provisioned with loop start, ground start or reverse battery signaling. OC is provided as a standard feature on XX0 Xxxxx. The OC feature will allow NewPhone to coordinate the installation of the Loop with the disconnect of an existing customer’s service and/or number portability service. In these cases, BellSouth will perform the order conversion with standard order coordination at its discretion during normal work hours.

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Unbundled Voice Xxxx XX0 (XXX-XX0) Loops are 2-wire Loop start circuits, will be non-designed, and will not have remote access test points. OC will be offered as a chargeable option on XX0 Xxxxx when reuse of existing facilities has been requested by ONS. ONS may also order OC-TS when a specified conversion time is requested. OC-TS is a chargeable option for any coordinated order and is billed in addition to the OC charge. An Engineering Information (EI) document can be ordered as a chargeable option. The EI document provides Loop Make-Up information which is similar to the information normally provided in a Design Layout Record (DLR). Upon issuance of a non-coordinated order in the service order system, XX0 Xxxxx will be activated on the due date in the same manner and time frames that BellSouth normally activates POTS-type Loops for its End Users.

  • Dienste Und Materialien Von Drittanbietern (a) Die Apple-Software gewährt möglicherweise Zugang zu(m) iTunes Store, App Store, Apple Books, Game Center, iCloud, Karten von Apple und zu anderen Diensten und Websites von Apple und Drittanbietern (gemeinsam und einzeln als „Dienste“ bezeichnet). Solche Dienste sind möglicherweise nicht in xxxxx Sprachen oder in xxxxx Ländern verfügbar. Die Nutzung dieser Dienste erfordert Internetzugriff und die Nutzung bestimmter Dienste erfordert möglicherweise eine Apple-ID, setzt möglicherweise dein Einverständnis mit zusätzlichen Servicebedingungen voraus und unterliegt unter Umständen zusätzlichen Gebühren. Indem du diese Software zusammen mit einer Apple-ID oder einem anderen Apple-Dienst verwendest, erklärst du dein Einverständnis mit den anwendbaren Servicebedingungen für diesen Dienst, z. B. den neuesten Apple Media Services-Bedingungen für das Land, in dem du auf diese Services zugreifst, die du über die Webseite xxxxx://xxx.xxxxx.xxx/legal/ internet-services/itunes/ anzeigen und nachlesen kannst

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • Conversion of Live Telephone Exchange Service to Analog 2W Loops The following coordination procedures shall apply to “live” cutovers of VERIZON Customers who are converting their Telephone Exchange Services to SPRINT Telephone Exchange Services provisioned over Analog 2W unbundled Local Loops (“Analog 2W Loops”) to be provided by VERIZON to SPRINT.

Time is Money Join Law Insider Premium to draft better contracts faster.