Common use of Design Criteria Clause in Contracts

Design Criteria. The Engineer shall prepare all work in accordance with the latest version of applicable State’s procedures, specifications, manuals, guidelines, standard drawings, and standard specifications or previously approved special provisions and special specifications, which include: the PS&E Preparation Manual, Roadway Design Manual, Hydraulic Design Manual, the Texas Manual on Uniform Traffic Control Devices (TMUTCD), Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (latest Edition), and other State approved manuals. When design criteria are not identified in State manuals, the Engineer shall notify the State and refer to the American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Street, (latest Edition). In addition, the Engineer shall follow the State’s District guidelines in developing the PS&E package. The Engineer shall prepare each PS&E package in a form suitable for letting through the State’s construction contract bidding and awarding process. The Engineer shall identify, prepare exhibits and complete all necessary forms for each Design Exception and Waiver required within project limits prior to the 30% project completion submittal. The Engineer shall submit each exception and waiver to the State for coordination and processing of approvals. If subsequent changes require additional exceptions, the Engineer shall notify the State in writing as soon as possible after identification of each condition that may warrant a design exception or waiver.

Appears in 5 contracts

Samples: Attachment E – Fee, Agreement, sb20pca.txdot.gov

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.