Delivery of Electrical Power to the Complex Sample Clauses

Delivery of Electrical Power to the Complex. From and after the completion and commissioning of the Purchaser Interconnection Facilities, the Purchaser shall, to the extent necessary to carry out any testing of the Complex, including Commissioning Tests, transport electrical energy in accordance with the schedules provided to the Purchaser pursuant to Section 4.2 and Section 8.1. From and after the Commissioning of the Seller Interconnection Facilities, the Purchaser shall (to the extent reasonably possible) transport to the Interconnection Point sufficient electrical power to operate the Complex (including the start up of the WTGs) during any period that the Complex is unable to generate sufficient electrical power for such purpose. For the avoidance of doubt, the Seller shall pay for such electrical power in accordance with Section 9.4(b).
AutoNDA by SimpleDocs
Delivery of Electrical Power to the Complex. From and after completion and commissioning of the Purchaser Interconnection Facilities, the Purchaser shall, transport electrical energy to the Complex for Commissioning Tests, emergencies, black starts and any Start-Up, in accordance with the schedules provided to the Purchaser pursuant to Section 4.2 and Section 8.1. From and after Commissioning of the Seller Interconnection Facilities, the Purchaser shall (to the extent reasonably possible) transport to the Interconnection Point sufficient electrical power to operate the Complex during any period that the Complex is unable to generate sufficient electrical power for such purpose. For the avoidance of doubt, the Seller shall pay for such electrical power in accordance with Section 9.4(b)(i).

Related to Delivery of Electrical Power to the Complex

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Electrical Provide drawings for the following systems:

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges. Customer understands and agrees that included in the Administration Charge is the cost of the Energy Balancing Amount (defined below). Customer understands that in order for RITERATE ENERGY to be able to supply Energy to its existing and prospective customers, RITERATE ENERGY enters into supply arrangements to meet the forecasted consumption of its various groups of customers. These forecasts are based on historical data, load shapes and/or estimates. To the extent that actual pooled consumption of RITERATE ENERGY’s Energy customers varies from supply arrangements and/or Customer’s Utility delivery requirements, RITERATE ENERGY incurs a cost in balancing and settling its supply arrangements with such pooled consumption. To ensure a fixed all-inclusive Rate, RITERATE ENERGY has included in the Administration charge, the Energy Balancing Amount, to balance and settle the variance between pooled consumption and supply arrangements (the “Energy Balancing Amount”). In respect of Electricity, Customer understands that there are certain estimated pass through costs, made up of charges to RITERATE ENERGY by the PJM Interconnection (“PJM”) and/or Customer’s Utility, including but not limited to ancillary service charges, the cost of unaccounted for electricity, capacity charges and any replacement or recharacterization of these charges. In this regard, the “PJM Adjustment”, is included in the Fixed Price Rate. Customer acknowledges and agrees that by entering into this Agreement, Customer will not be eligible to receive any net metering credits and other incentives to which Customer would otherwise be entitled. Further, included in the Rate are the amounts charged or billed to RITERATE ENERGY or Customer by Customer’s Utility, the PUC or any other regulatory or government entity, including any taxes, delivery, regulated transmission, regulated distribution, pipeline, compressor fuel, uplift, congestion, locational marginal pricing, invoice market participant, service, billing, or similar or related changes and any, deposits, interest or late payment fees or other amounts in connection with the supply and delivery of Energy to the Premises (collectively, “Regulatory Charges”). Customer agrees to pay the monthly Administration charge for Energy supply (the “Administration” charge).

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Air and Water Subrecipient agrees to comply with the following regulations in so far as they apply to the performance of this Contract: Clean Air Act, 42 U.S.C., 1857, et seq. Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251, et seq. Environmental Protection Agency (EPA) regulations pursuant to 00 XXX 00 xxx 00 XXX 00.