Daphniafilter System Start Up Sample Clauses

Daphniafilter System Start Up. ➢ The availability of suitable daphnia species or similar planktonic crustaceans should be considered in region specific designs and appropriate specification for alternatives to Daphnia Magna provided. ➢ The sensitivity of the daphnia to environmental conditions in general and temperature change in particular, temperature drops, should be considered in region specific designs and or commercial offering. In particular for water stressed areas the viable temperatures for daphnia are likely to coincide with prolonged dry periods. ➢ In the case of the Daphniafilter it is essential to control wastewater quality parameters and water temperature before the inoculation of the daphnia to ensure their best chance of survival.
AutoNDA by SimpleDocs
Daphniafilter System Start Up. The availability of suitable daphnia species or similar planktonic crustaceans should be considered in region specific designs and appropriate specification for alternatives provided ✓ ✓ The sensitivity of the daphnia to temperature change in particular, temperature drops, should be considered in region specific designs and or commercial offering ✓ ✓ ✓ ✓ For water stressed areas the viable temperatures for daphnia are likely to coincide with prolonged dry periods this can be a positive in region specific designs ✓ ✓ ✓ ✓ It is essential to control wastewater quality parameters and water temperature before the inoculation of the daphnia to ensure their best chance of survival. ✓ ✓ Table 7-3 (continued) Mapping Lessons from System Start-up and Commissioning System Start-up and Commissioning Commercial Offering D6.4‌ Product Design D6.2 Site Suitability D6.2 I, O, M Protocols D6.2

Related to Daphniafilter System Start Up

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Porcupine Site Highway 11

  • FABRICATION Making up data or results and recording or reporting them.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Construction Phase Services 3.1.1 – Basic Construction Services

Time is Money Join Law Insider Premium to draft better contracts faster.