Control and testing of production Sample Clauses

Control and testing of production. If requested by SLL during the manufacturing of the Equipment or the installation work, the Supplier shall provide SLL with any and all information needed to assess whether the Equipment and the installation works will comply with the conditions under the Agreement, provided that SLL observes provisions on secrecy etc. which shall apply for such information according to the Supplier. During the manufacturing, the Supplier shall at its own liability, risk, and cost, test the Equipment in accordance with the standards generally applied within the industry. The Supplier shall ensure that SLL is given the opportunity to be present during such tests by giving SLL notice hereof at least [ ] before the planned testing day. The Supplier shall take minutes at the tests which shall be provided to SLL and – unless the contrary is shown – such minutes shall be deemed to correctly account for the execution and results of the tests.
AutoNDA by SimpleDocs

Related to Control and testing of production

  • Marketing of Production Except for contracts listed and in effect on the date hereof on Schedule 7.19, and thereafter either disclosed in writing to the Administrative Agent or included in the most recently delivered Reserve Report (with respect to all of which contracts the Borrower represents that it or its Subsidiaries are receiving a price for all production sold thereunder which is computed substantially in accordance with the terms of the relevant contract and are not having deliveries curtailed substantially below the subject Property’s delivery capacity), no material agreements exist which are not cancelable on 60 days notice or less without penalty or detriment for the sale of production from the Borrower’s or its Subsidiaries’ Hydrocarbons (including, without limitation, calls on or other rights to purchase, production, whether or not the same are currently being exercised) that (a) pertain to the sale of production at a fixed price and (b) have a maturity or expiry date of longer than six (6) months from the date hereof.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Medical Verification The Town may require medical verification of an employee’s absence if the Town perceives the employee is abusing sick leave or has used an excessive amount of sick leave. The Town may require medical verification of an employee’s absence to verify that the employee is able to return to work with or without restrictions.

  • Tests and Preclinical and Clinical Trials The preclinical studies and clinical trials conducted by or, to the Company’s knowledge, on behalf of the Company, that are described in the Registration Statement, the Pricing Disclosure Package and the Prospectus, as applicable, and are intended to be submitted to FDA or other comparable government entities, were and, if still ongoing, are being conducted in all material respects in accordance with experimental protocols, procedures and controls pursuant to accepted professional scientific standards and all Authorizations and Applicable Laws, including, without limitation, the Federal Food, Drug and Cosmetic Act and the rules and regulations promulgated thereunder and for studies submitted to regulatory authorities for approval, current Good Clinical Practices and Good Laboratory Practices and any applicable rules and regulations of the jurisdiction in which such trials and studies are being conducted; the descriptions of the results of such studies and trials contained in the Registration Statement, the Pricing Disclosure Package and the Prospectus are, to the Company’s knowledge, accurate and complete in all material respects and fairly present the data derived from such studies and trials; except to the extent disclosed in the Registration Statement, the Pricing Disclosure Package and the Prospectus, the Company is not aware of any studies or trials, the results of which the Company believes reasonably call into question the study or trial results described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus when viewed in the context in which such results are described and the clinical stage of development; and, except to the extent disclosed in the Registration Statement, the Pricing Disclosure Package or the Prospectus, the Company has not received any written notices or written correspondence from the FDA or any governmental entity requiring the termination or suspension of any preclinical studies or clinical trials conducted by or on behalf of the Company, other than ordinary course communications with respect to modifications in connection with the design and implementation of such trials, copies of which communications have been made available to you.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Interoperability To the extent required by applicable law, Cisco shall provide You with the interface information needed to achieve interoperability between the Software and another independently created program. Cisco will provide this interface information at Your written request after you pay Cisco’s licensing fees (if any). You will keep this information in strict confidence and strictly follow any applicable terms and conditions upon which Cisco makes such information available.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

Time is Money Join Law Insider Premium to draft better contracts faster.